K-WANG

+086-15305925923
Service expert in industrial control field!
NameDescriptionContent
Adequate Inventory, Timely Service
pursuit of excellence 
Ship control system
Equipment control system
Power monitoring system
Current position:
新闻动态
newS
   
Brand

GE Hydran* M2 Transformer Gas Monitoring System Installation Guide

From: | Author:Wang | Time :2025-04-10 | 582 visit: | 🔊 Click to read aloud ❚❚ | Share:

GE Hydran* M2 Transformer Gas Monitoring System Installation Guide

caveat

Follow the operating procedures: Strictly follow the steps in the manual, any deviation may damage the equipment and even lead to property damage, injury or death.


Professional operation: Installation and maintenance must be carried out by qualified personnel, the station operator needs to be notified before maintenance, operation inside the equipment may trigger an alarm.


Electrical safety: When making electrical connections, switch off the power supply at the fuse box or at the service panel, make sure that it is well earthed, use suitable cables and overcurrent protection, and use 2.08 mm2 (14 - AWG) cable within 15m of the power supply.


Installation location and environment

Choose a suitable location: give priority to typical locations such as a straight section of radiator return pipe, if this is not available, contact customer service to determine an alternative location, avoid installing in an unrecommended location such as the inlet side of a radiator pump.

Avoid unfavourable environments: Prevent the device and sensor from coming into contact with high-pressure water flow, do not paint or clean the sensor with solvents.


Sensor Protection

Prevent damage: Do not touch the sensor membrane to avoid puncturing or scratching, keep the plastic cover in place before installation, and install without blocking the breathing hole or puncturing the membrane.


Proper Installation: Wrap the sensor threads with PTFE tape during installation, install horizontally with the exhaust screws at the 12 o'clock position, exhaust and clean up any oil after installation.


Use of tools and installation operations

Use of the right tools: The installer provides some of his own tools and selects and uses them according to the requirements, such as tightening the sensor with the right spanner.


Standardise the installation process: Standardise the installation process, e.g. install the housing by tightening the 4 screws evenly and diagonally to a torque of not less than 50 lbf - in (5.6 N - m) to prevent the ingress of water.


Electrical Connections and Wiring

Connect the cables correctly: Connect the analogue inputs, outputs, alarm relays and AC power cables according to the different types, make sure that they are connected correctly, ground all metal conduits, and plug any unused openings.

Pay attention to the communication wiring: RS-485 wiring as required, when connecting to the Hydran 201Ci controller or other equipment, pay attention to the parameter settings and cable connection methods.


Software configuration and commissioning

Parameter setting: Set the date and time, gas and humidity alarm parameters, network communication parameters, etc., wait for the device readings to stabilise and then set the alarm parameters, and set the parameters of the devices in the network as required.

Sensor Test: After testing the sensor, readings are not available for 2 minutes, compare gas level readings and recent DGA data during commissioning.


Detection performance advantages

Accurate monitoring of gas and humidity: real-time monitoring of gas content and humidity level inside the transformer, through setting gas and humidity alarm parameters, it can timely detect abnormalities, such as excessive gas concentration or humidity exceeding the standard, which provides key data support for the safe operation of the transformer.


Trend analysis function: with gas hourly trend and daily trend monitoring function, it helps to analyse potential problems inside the transformer and predict the risk of failure in advance, so as to take preventive maintenance measures and reduce the loss caused by sudden failure.


Installation Advantages

A variety of installation position options: Provide a variety of installation positions suitable for different transformer structures, including the straight section of the radiator return pipe, filling valve, top of the radiator, drain valve, etc., and detailed description of the advantages and disadvantages of each position, which is convenient to choose flexibly according to the actual situation, and improve the adaptability of the installation.


Installation Convenience: Equipped with some installation tools, such as 3/16 - in hexagonal key, 1/16 - in and 5 - 32 - in standard hexagonal (Allen) L-type key, wrenches, PTFE tape, etc., which reduces the trouble of installers to prepare additional tools; at the same time, the installation steps are clearly defined, from the separation of the sensor from the device, to the installation of valves, and then the connection of cables, etc., there is a detailed operation guide, which reduces the difficulty of installation. At the same time, the installation steps are clear, from the separation of the sensor and equipment to the installation of the valve and cable connection, there are detailed operating instructions, reducing the difficulty of installation.


Communication and Networking Advantages

Flexible communication methods: Supporting a variety of communication methods, such as RS-485, RS-232, but also through the Ethernet (wired or optical fibre), modem data transmission, to meet the needs of different scenarios and other equipment or system communication.

Powerful Networking Capability: It can be daisy-chained via RS-485 link to build a local network, connecting up to 32 Hydran M2 devices, with a maximum cable length of 1200m (4000ft), which is easy to set up and expand a large-scale transformer monitoring system, and achieve centralised management and monitoring.


Software Configuration Advantages

Friendly user interface: The user interface is easy to operate, and various parameter settings, function selections and data viewing can be easily carried out by pressing the keys. Such as the use of arrow keys to navigate options, parameters or numbers, Esc key to return to the previous level of the menu, the context key according to the content of the screen to perform different functions, reducing the user's operating difficulties.

Flexible parameter setting: it can flexibly configure a variety of parameters, including date and time, gas and humidity alarm thresholds, network communication parameters, analogue input and output parameters, etc., which can be personalised according to the actual needs to meet the requirements of different transformer operation monitoring.


Maintenance and Warranty Advantages

Complete Warranty: GE Energy offers a standard warranty that the product is guaranteed to be free from defects in material, workmanship and ownership. Software is covered by a 90-day warranty, and hardware is covered by a warranty based on the time of use or delivery, during which time problems can be repaired or replaced in a timely manner.

Comprehensive technical support: Provide global 24-hour customer service support, users in the installation, use and maintenance of the process encountered problems, you can contact the customer service centre at any time to get help to ensure that the normal operation of the equipment.



  • SHINKAWA FRP 360A - BOARD
  • SHINKAWA IBP-43AM - PCB Board
  • SHINKAWA IBP-42-M - PCB Board
  • SHINKAWA DSP-11C - PCB Board
  • SHINKAWA FRP-341E - BOARD
  • SHINKAWA CPP-111 - PCB Board
  • SHINKAWA FRP-342A - BOARD
  • SHINKAWA FRP-341D - BOARD
  • SHINKAWA MDP-X MDP-135 - PCB Board
  • SHINKAWA MGP-57 - BOARD
  • SHINKAWA FRP-226A - PCB Board
  • SHINKAWA MDP-141 - PCB Board
  • SHINKAWA IOP-188 - BOARD
  • SHINKAWA FRP-341C - BOARD
  • SHINKAWA MDP-90 - PCB Board
  • SHINKAWA CPP-107A - PCB Board
  • SHINKAWA FRP-227A - PCB Board
  • SHINKAWA FRP-249A - PCB Board
  • SHINKAWA MDP-74 - PCB Board
  • SHINKAWA FRP-270 FRP-268 - PCB Board
  • SHINKAWA FRP-386 - PCB Board
  • SHINKAWA ZUP-02C - BOARD
  • SHINKAWA MDP-136A - PCB Board
  • SHINKAWA FRP-259 - PCB Board
  • SHINKAWA JBP-470 - BOARD
  • SHINKAWA MDP-82 - BOARD
  • SHINKAWA FCP-07A - PCB Board
  • SHINKAWA DSP-09A - PCB Board
  • SHINKAWA IOP-178 - PCB Board
  • Nemic-Lambda / Shinkawa VS15C-15 CCB010A UTC-1000 - Power Supply Board
  • SHINKAWA IOP-176A - PCB Board
  • SHINKAWA VM-5C SST-2194-001-P001G - ECCENTRICITY MONITOR
  • SHINKAWA VM-5K SST-2194-001-P001G - VIBRATION MONITOR
  • THK / Shinkawa SRS9M UTC-1000 - Linear Block w/ Rail 26cm
  • Shinkawa JBP-316 P-26-73B-1 P-26-73A-1 UTC-1000 - Board
  • SHINKAWA IOP-215 - BOARD
  • SHINKAWA JBP-268 - PCB Board
  • SHINKAWA ZUP-08 - PCB Board
  • SHINKAWA BCP-05A - BOARD
  • SHINKAWA DSP-15 - PCB Board
  • SHINKAWA FRP-289 - PCB Board
  • SHINKAWA FCP-01 - BOARD
  • SHINKAWA MDP-84 - BOARD
  • SHINKAWA CMU-13A - CAMERA MOTION CONTROLLER
  • SHINKAWA BCP-05D - PCB Board
  • SHINKAWA MDP-FF MDP-87 - Stage Control Board
  • SHINKAWA FRP-342 - BOARD
  • SHINKAWA BCP-05C - BOARD
  • Shinkawa CMU-26A - Camera Control unit
  • SHINKAWA PSP-30 - Welding Machine Control Board
  • SHINKAWA EFU-24 - Spark Generator
  • Shinkawa CMU-27A - Camera Control unit
  • SHINKAWA CMU-44 - Camera Control Unit
  • THK / Shinkawa SRS9M UTC-1000 - Linear Block w/ Rail 21cm
  • TDK-Lambda / Shinkawa VS100B-24 VS100B24 UTC-1000 - Power Supply Board
  • SHINKAWA CMU-34 - Camera Control Unit
  • SHINKAWA FDP-06A - PCB Board
  • SHINKAWA BCP-06A - BOARD
  • SHINKAWA CMU-13A - Camera Control Unit
  • SHINKAWA CMU-31A - Camera Control Unit
  • SHINKAWA VM-5Y1-02/GEM 1594-005-P001G - ECCENTRICITY MONITOR
  • Shinkawa JBP-331 P-26-101B P-26-101A P26101A UTC-1000 - Board
  • SHINKAWA CMU-26 - Camera Control Unit
  • Shinkawa ACB-3000 ACB3000 - Industrial-Grade Automated Friction Bonder
  • Shinkawa SBB-1100 SBB1100 - Stud Bump Bonder Machine
  • Shinkawa ACB-1000 ACB1000 - Super Automated Wire Bonder Machine
  • CKD / Shinkawa FCS500-H6H6 FCS500H6H6 UTC-1000 - Precision Air Source Filter
  • SHINKAWA VM-5H3 1596-001-P002B VM-5Z1 3595-001-P003C - Power Supply Monitor Rack
  • SHINKAWA VM-5H3 2194-001-F004B - Dual Vibration Dual Thrust Monitor Rack
  • Shinkawa EFU-10 - Wire Bonder Spark Generator EFO Box
  • SHINKAWA MP-2S - Overspeed Unit Instruction
  • Shinkawa PK-167B-3 PK-167A-3 10P-10 - PCB Board
  • SHINKAWA VM-3D VM-3E VL VM-3D2 - Vibration Sensor Mit Verlangerungskabel
  • shinkawa FKP-452F2-3 - Sensor
  • shinkawa UTC-1000 ZUP-02B - PCB BOARD
  • SHINKAWA VM-3D VM-3E VL VM-3D2 - VIBRATION SENSOR WITH EXTENSION CABLE
  • Shinkawa E194236-0003 AWM 2464 UTC-1000 - Cable 6&4 Pins Female-Female
  • TDK-Lambda / Shinkawa VS100B-15 VS100B15 UTC-1000 - Power Supply Board
  • Shinkawa FK-202F2-2-1 - Electric Vortex Sensor
  • Marubeni Shinkawa S038493 - Rotary Encoder
  • Shinkawa E194236-0003 AWM 2586 UTC-1000 - Cable 10 & 8 Pins Male-Female
  • National / Shinkawa CAT5E NR3160 UTC-1000 - Ethernet Receptacle Connector Cable
  • Shinkawa LLS2902 E69157 UTC-1000 - Cable 3 Pins Male-Female
  • Shinkawa AWG16 600V UTC-1000 - 5 Pins Cable Female-Female
  • SHINKAWA WK-142K2-2 - Vibration sensors
  • Shinkawa DA-C8-J10 DAC8J10 UTC-1000 - Connector Cable
  • Shinkawa P-27-67B P2767B P-27-67A P2767A UTC-1000 - Circuit Board
  • Taiyo / Shinkawa E67647-WH E67647WH UTC-1000 - Computer Power Cable
  • Shinkawa E66085-H 20276 UTC-1000 - Connector Cable 15 Pins Male-Male
  • Shinkawa P-28-49B JBP-380C P-28-49A BEJ240619A UTC-1000 - Board w/
  • Shinkawa WKN-142K2-2 - 2-Wire vibration transmitter
  • SHINKAWA VM-741 VM-741B - MONITORING SYSTEM
  • Shinkawa FL-202F08R-U2-02-12-10 - Extension probe
  • Shinkawa FK-202F-1-3 FK-202F-2-3 - module
  • Shinkawa CMU-13A CMU13A - Camera Motion Control Unit Cut Cable
  • SHINKAWA VM-5J - DUAL DIFFERENTIAL EXPANSION MONITOR
  • Ebrain / Shinkawa 650-VME08IS-S N6071085 UTC-1000 - Backplane Panel Board
  • Yaskawa Electric / SHINKAWA UGQMEM-06-SW12 MD-11 - Minertia Motor w/ 30 day warranty
  • Shinkawa FL-202F08R-U2-02-12-10 - Extension probe
  • Shinkawa WT-650-16 SP-256A UTC-1000 - Power Source Power Supply AC100V 50/60Hz
  • Yaskawa / Shinkawa UGRMEM-01SSW11 UGRMEM01SSW11 MD-06 - Minertia Motor
  • SHINKAWA FK-452F1 - sensor
  • Shinkawa MS-313 - RPS positioning system
  • Shinkawa Sec M / Rn-ac109-2a - Beschleunigungsmesser
  • Shinkawa PFD80SX UTC-1000 - Power Source Power Supply 80V 1.6A AC100-230V
  • SHINKAWA VL-202A08L-1A72 - Probe extension cable
  • Shinkawa SDP-FA-4.1 - Instruction Manual
  • SHINKAWA VM-5L G0-2 GC6D1377 - Module
  • Shinkawa FRP-184A FRP-111 P-22-17A - Circuit Board
  • Shinkawa CRP-06 PK-189A-3 PK-189B-3 - PCB Board
  • Shinkawa WK-142K2-1 - Vibration Transmitter
  • SHINKAWA VM-5 SST-2194-001-P001G - MAIN BOARD DUAL VIBRATION MONITOR MAIN BOARD
  • Shinkawa SDP-FA-TAPE - Full Automatic Die Bonder Instruction Manual
  • Sanritz Automation / Shinkawa SC2125-0 C12ABP3 SC2125-0-P1 UTC-1000 - Board
  • Shinkawa SDP-FA-4.1 - Die Pickup Unit Instruction Manual
  • Shinkawa E194236-0003 AWM 2464 UTC-1000 - Cable 20 Pins Female-Female
  • IHI / SHINKAWA CQ71SEN004 WK-142K3-3 - 2-wire Transmitter
  • SHINKAWA FK-452F1 - sensor
  • Shinkawa D461256 - Pin Vertical Motion Cam
  • SHINKAWA SE02111-05 STB-FA-IL-7 - Full Automatic Inner Lead Bonder Specifications
  • Shinkawa PSP-25A P-26-58A-3 P2658A3 UTC-1000 - Circuit Controller Board
  • Shinkawa WKN-142K5-2 - Vibration Transmitter
  • Euresys / Shinkawa DAC-422S-A3 DAC422SA3 UTC-1000 - Alpha cPCI Board
  • Shinkawa IL-188-5373-23 IL188537323 - Spare Part
  • Shinkawa FK-202F1-3-1 - Vibration sensor
  • Shinkawa VL-202A08L-1018/BEN - Capteur De Proximite Avec Cable De 9 Metres
  • Shinkawa FK-202F-2-3 - Vibration Transmitter
  • Shinkawa IL-189-6337-37 IL189633737 - Side