ABB SNAT617CHC control unit
Ambient operating temperature is 0 to 50 degrees C (32 to 122 degrees F) Avoid exposure to corrosive gas
Not intended for a combustible dust environment
Not intended for below surface mining applications
Free from dust and static electricity
Space of at least 450 mm (18 inches) to each side of the oven for various customer
connections and servicing
Space of at least 406 mm (16 inches) in front of the oven, for servicing
The Oven with Integrated Controller can be located up to 100 meters (328 feet) from any associated
oven. The Oven with Integrated Controller communicates with associated ovens through fiber optic
cables.
2.1.4 Precautions
Review the following precautions during installation and before starting the analyzer. Observe and
take note of all caution tags attached to the analyzer.
NOTICE – Equipment damage. Temperature of protective air for purge/pressurization
must not exceed 40 degrees C (104 degrees F).
Inspection required for accumulated dust before applying electric power.
Clean display with damp cloth only.
Conduit entries not used must be sealed with an approved blanking plug.
Main power supply must not exceed ±10% of the equipment rated voltage.
2.2 Prepare for installation
Since Analyzer configuration depends on the application, this manual contains only generic
engineering drawings and diagrams. Utilize the drawings, diagrams and replacement parts lists
provided in the Data Package supplied with your analyzer to ensure they are the correct ones for your
system.

After unpacking the analyzer, inspect it for damage. Also check the packing list provided with the
analyzer to make sure all equipment is included. The packing list, which is taped on the box or crate,
contains a list showing how many cartons were shipped and what each box or crate contains.
2.2.1 Installation tools and equipment
The recommended standard tools and equipment for installation are:
5/32 inch hex key wrench (supplied)
5/16 inch hex key wrench (supplied)
7/16 inch open end wrench (2)
6 inch flat blade screwdriver
9/16 inch wrench
5/8 inch wrench
8 inch adjustable wrench
Wire strippers
Digital flow meter
Leak detection solution
2.2.2 Plumbing installation
All plumbing connections enter at the right side of the Oven and Master Controller cabinets. Be careful
to avoid damaging fittings and to ensure tight connections. Refer to the Data Package for specific
plumbing information.
For brass and stainless steel pipe fittings, wrap the threads with PTFE tape or a suitable thread
sealant. Make all connections and then tighten them appropriately. Leak check each connection as
described in section 3.4.1.
2.2.3 Gas requirements
The following information represents general gas requirements for the PGC5000. Due to differences in
applications, refer to the Data Package for application-specific requirements for each analyzer.
Instrument air: instrument grade air