K-WANG

+086-15305925923
Service expert in industrial control field!
NameDescriptionContent
Adequate Inventory, Timely Service
pursuit of excellence 
Ship control system
Equipment control system
Power monitoring system
Current position:
新闻动态
newS
   
Brand

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

From: | Author:Wang | Time :2025-11-13 | 518 visit: | 🔊 Click to read aloud ❚❚ ▶ | Share:

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

Core parameters and compatibility

1. Key specifications

Output parameters: 120V, 20A, 60Hz, maximum output power matching generator operating power of 2400W.

Input parameters: Grid input 120V 20A 60Hz, generator input 120V 20A 60Hz (equipped with L14-30P plug).

Interface configuration: 120V 20A 5-20R dual socket, grid power input port, generator control cable interface, 25 foot generator power cord.

Protection configuration: 20A circuit breaker to prevent overload damage to equipment.

2. Compatibility requirements

Only compatible with Westinghouse generators with "Smart Switch Ready" interface, not compatible with other brands or generators without this interface.

Do not use in series with other conversion switches, do not connect GFCI sockets or use socket adapters.


Core functions and working principles

1. Full process working mechanism

(1) When the power grid is normal (standby mode)

Power supply path: grid power supply → transfer switch → connected electrical appliances. At this time, the green "grid power indicator light" is constantly on.

Additional function: The generator battery is continuously charged by the power grid through the generator control cable, ensuring that the generator battery is fully charged and can be started at any time.

Key state: The generator is in the "RUN" position but not starting, only the battery charging circuit is working.

(2) When the power grid is cut off (emergency power supply state)

Trigger mechanism: When the conversion switch detects a power outage in the power grid, the red "power grid interruption indicator light" immediately lights up.

Start up process: After a delay of 5-10 seconds (to avoid accidental triggering due to instantaneous fluctuations in the power grid), send a start signal to the generator through the control cable, and the generator will automatically start and enter a stable operating state.

Switching power supply: After the generator output stabilizes (within about 30 seconds), the transfer switch automatically cuts off the power grid circuit and connects the generator power supply circuit. The green "generator power indicator light" lights up, and the electrical appliances are powered by the generator.

(3) When the power grid is restored (switching and cooling state)

Detection process: After the power grid is restored, the transfer switch first undergoes a 5-10 second stability test (to prevent frequent switching caused by voltage fluctuations in the power grid), and at this time, the red and green indicator lights are constantly on.

Switching power supply: After confirming the stability of the power grid, cut off the generator power supply circuit, connect the power grid circuit, the red "power grid interruption indicator light" will turn off, and the electrical appliances will resume power supply to the grid.

Cooling shutdown: The switch keeps the generator running for 45-50 seconds during the cooling period to avoid damage to the engine caused by high-temperature shutdown. After the cooling is complete, the generator will automatically shut down and the green "generator power indicator light" will turn off.

2. Full analysis of indicator lights (including abnormal states)

Description of indicator light combination status and operation suggestions

Only the green grid light stays on and is in normal standby mode. The power is supplied by the grid, and there is no need to operate the generator battery during charging. Regularly check the cable connections

Only the red power grid interruption light remains on. The power grid has been cut off, and we are waiting to start the generator to confirm that the fuel and oil are sufficient and there are no fault alarms

Only the green generator light is constantly on, and the power grid has not been restored to monitor the operation status of the generator to ensure sufficient fuel supply

The traffic lights are constantly on at the same time, and the power grid has been restored. Stability testing will be conducted and wait for 5-10 seconds without manual intervention

The green light stays on and the red light flashes. The power grid is restored but the voltage is unstable. Keep observing. If it does not return to normal within 1 minute, check the power grid line

The generator light is constantly on+the grid light is flashing. The generator power supply is normal, and the grid is in a fluctuating state without operation. The transfer switch will continue to monitor the grid

No indicator light is on, the conversion switch is not connected to the power grid, or there is an internal fault. Check if the power grid connection line is tightly plugged in. If the connection is normal, it needs to be reported for repair

Safety operation standards (including risk avoidance)

1. Installation and placement safety

Generator placement requirements:

It must be placed in an outdoor ventilated area, at least 15 feet (about 4.6 meters) away from the doors, windows, and ventilation openings of the house, to prevent carbon monoxide exhaust from entering the room.

Place on a hard, level surface to avoid tilting and causing fuel leakage; Keep a safe distance of at least 3 feet (approximately 0.9 meters) away from flammable materials such as hay, wood, and paint.

It is prohibited to place the generator on rainy, snowy, or damp ground. A temporary rain shelter (not enclosed) must be built to prevent rainwater from entering the generator and causing a short circuit.

Requirements for placement of transfer switch:

Only suitable for indoor use, placed in a dry, ventilated, away from water sources (such as kitchens, bathrooms) and flammable materials.

Do not place it in areas prone to water accumulation such as basements and low-lying areas to avoid equipment short circuits caused by floods or water leaks.

The placement height should be at least 1 foot (about 0.3 meters) above the ground to prevent moisture erosion on the ground.

2. Cable connection safety

Connection sequence: The power grid must be connected first, then the generator control cable, and finally the generator power line. It is forbidden to reverse the sequence.

Cable requirements:

Grid input extension cable: A grounded three core cable with no damage or aging is required, with a length not exceeding 30 feet (approximately 9.1 meters) and a core cross-sectional area of ≥ 1.5mm ².

Generator control/power cord: The total length should not exceed 50 feet (approximately 15.2 meters). If extension is required, Westinghouse original extension cords (model 3021225C is the power cord extension cord, STCORD25 is the control cable extension cord) must be used. Non original cables are prohibited.

Connection operation:

All connections must be made after the generator is turned off and cooled down, and the plug must be fully inserted into the interface and locked to avoid loosening and overheating.

After connection, check that the cables are not twisted or compressed, and keep them away from high-temperature components such as the generator exhaust pipe to prevent cable aging.

3. Safety of electrical loads

Load accounting rules:

Pure resistance load (light bulb, heater, rice cooker): total operating power ≤ 20A × 120V=2400W.

Inductive loads (motors: refrigerators, water pumps, air conditioners): starting power=operating power multiplied by multiple (small handheld devices multiplied by 1.2, large fixed devices multiplied by 3.5), total starting power ≤ 2400W.

Example: 1500W space heater (pure resistor)+700W refrigerator (starting power 700 × 3.5=2450W), total starting power 2450W>2400W, cannot be connected simultaneously; 1500W heater+500W furnace (starting power 500 × 1.2=600W), total starting power 2100W ≤ 2400W, can be connected simultaneously.

Taboo for load connection:

Prohibit the connection of electrical appliances with unknown power to avoid overload triggering circuit breaker tripping.

It is prohibited to simultaneously connect multiple large inductive loads (such as two air conditioners, one water pump+one air conditioner) to prevent excessive starting power.

When connecting electrical appliances, it is necessary to first turn off the electrical switch and then turn it on again to avoid arcing caused by load insertion and removal.

4. Emergency safety handling

Generator malfunction unable to start: Immediately disconnect the transfer switch from the generator, manually start the generator to troubleshoot (such as low fuel, low oil, spark plug malfunction), and reconnect after troubleshooting.

The transfer switch does not switch the power supply: check the status of the indicator light. If the red light is on after the power grid is cut off but the generator does not start, check the connection of the control cable; If the green light does not turn on after the generator is started, check the power cord connection and restart the transfer switch if necessary (unplug the power grid for 30 seconds and then reinsert it).

Fire/Leakage Emergency: Immediately shut down the generator, unplug all connecting wires of the transfer switch, and use ABE or BE class fire extinguishers to extinguish the fire (water is prohibited from extinguishing electrical fires); If electric shock occurs, immediately cut off the power and seek medical attention.


Operation process (setup+testing+daily use)

1. Initial process setup (required steps)

Generator preparation:

Place the generator in a safe outdoor location, check that the fuel (unleaded gasoline) and engine oil (four stroke engine oil that meets the requirements of the generator) levels are normal, and that the battery connection is secure.

Start the generator and test it to run normally independently. After confirming that there are no fault alarms, turn it off and cool it down to room temperature.

Switch connection:

Place the transfer switch in a dry indoor location, connect the grid power supply to the "grid power input port" of the transfer switch with a grounding extension wire, and the green grid indicator light will light up at this time.

Connect the generator control cable: Insert one end into the "Smart Switch Ready" interface of the generator and the other end into the "Control Cable Interface" of the conversion switch. You can hear the locking sound of the buckle.

Connect the generator power cord: Insert the 25 foot power cord L14-30P plug that comes with the conversion switch into the generator L14-30R socket, and tighten the fixing nut.

Electrical connections and generator settings:

Connect the electrical appliances that require emergency power supply (such as refrigerators and heaters) to the 120V dual socket of the conversion switch to ensure that the total power does not exceed the standard.

Turn on the "RUN" switch of the generator, confirm that the generator battery indicator light is on (indicating that the charging circuit is normal), and complete the first setting.

2. Functional testing process (must be done before first use)

Test purpose: To verify that the automatic switching function of the transfer switch is normal and to avoid failure in emergency situations.

Test preparation: Ensure all connections are complete, connect a small appliance (such as a desk lamp, phone charger), and confirm that the appliance is powered by the power grid normally.

Simulated power-off test:

Unplug the power grid input extension line of the conversion switch and simulate a power outage in the power grid.

Observe the indicator light: The red power grid interruption light will immediately turn on, and the generator will automatically start after 5-10 seconds.

Confirm switch: About 30 seconds after the generator starts, the green generator light will turn on, and the electrical appliances will be powered by the generator normally.

Simulated recovery test:

Re insert the power grid input extension line to simulate power grid recovery.

Observe the indicator lights: both traffic and green lights remain on (5-10 second detection period), then the red light goes out and the electrical appliances resume power supply to the grid.

Confirm shutdown: Wait for 45-50 seconds, the generator will automatically shut down, the green generator light will turn off, and the test is complete.

Exception handling: If a step in the test is not executed as expected, check if the cable connection is secure and if the generator is in the "RUN" position. After troubleshooting, retest.

3. Daily use and emergency activation process

(1) Daily maintenance (non emergency state)

Every month: Check if all cable connections are secure, without damage or aging; Start the generator and run it for 10 minutes to ensure that there are no faults in the generator.

Every 6 months: Conduct a complete test of the transfer switch according to the "functional testing process" to ensure that the automatic switching function is normal; Check the battery level of the generator and recharge it if necessary.

Long term use (exceeding 3 months): Disconnect the transfer switch from the power grid and generator, store the transfer switch in a dry environment, and maintain the generator according to long-term storage requirements.

(2) Emergency use (sudden power outage in the power grid)

No manual operation required: The switch automatically completes the entire process of "detecting power failure → starting the generator → switching power supply".

Key monitoring: Observe the status of the conversion switch indicator light and confirm that it switches as expected; Monitor the fuel level of the generator and replenish fuel if necessary under safe conditions (operate after shutting down the generator and cooling it down).

After the power grid is restored: without intervention, the transfer switch automatically switches back to the grid and shuts down the generator. After the generator cools down, its "RUN" switch can be turned off (or kept on for the next emergency start).


Maintenance and Warranty

1. Key points of maintenance and upkeep

Switch maintenance:

Cleaning: Use a dry cloth to wipe away surface dust. Do not use water or solvents for cleaning to prevent liquids from entering the interface.

Storage: When not in use for a long time, disconnect all connections and place in a dry, ventilated storage box, avoiding direct sunlight and high temperature and humidity environments.

Testing: Conduct a functional test every 6 months to ensure that there are no faults in the internal circuit.

Cable maintenance:

Regularly inspect the cable sheath for any damage or cracking, and ensure that the plug has no signs of oxidation or erosion.

Avoid excessive bending and squeezing during storage to prevent internal core breakage; The generator end cable should be kept away from high-temperature components such as exhaust pipes.

2. Detailed explanation of warranty policy

Warranty period: 1 year from the date of purchase, covering faults caused by material and process defects.

Warranty scope: For quality issues with the main body of the conversion switch and original cables (control cables, power cords), free repair or replacement of faulty components is provided.

Not covered by warranty:

Human damage (such as falling, collision, liquid immersion, overload use).

Unauthorized maintenance and modification (such as splicing cables, replacing non original components).

Normal wear and tear (such as plug contact wear), damage caused by natural disasters or accidents.

Malfunctions caused by failure to follow the manual, such as connecting incompatible generators or illegally extending cables.


Common troubleshooting

Possible causes and solutions for fault phenomena

The generator does not start after the power grid is cut off. 1. The control cable is not properly connected; 2. Insufficient battery power in the generator; 3. The generator is in the "OFF" position; 4. Generator malfunction (insufficient fuel/oil, alarm lock) 1. Check if the control cable plug is securely plugged in; 2. Manually start the generator to charge the battery or replace the battery; 3. Confirm that the generator is in the "RUN" position; 4. Check for generator faults and solve them according to the generator manual

The power supply is not switched after the generator is started. 1. The power cord is not properly connected; 2. Generator output fault; 3. Overload protection trip of transfer switch 1. Check if the power cord plug is tightened; 2. Disconnect the conversion switch and directly use the generator to supply power to the electrical appliance, verifying the output of the generator; 3. Disconnect part of the load and press the reset button of the circuit breaker on the transfer switch

After the power grid is restored, it will not switch back to the grid. 1. The voltage of the power grid is unstable; 2. Switch detection circuit fault 1. Use a multimeter to measure the grid voltage (normal 110-130V) and eliminate the grid problem; 2. Restart the conversion switch (unplug for 30 seconds and then reinsert), if it still does not work, report for repair

Abnormal flashing of indicator light: 1. Grid voltage fluctuation; 2. Internal circuit failure of the transfer switch. 1. Observe the restoration of the power grid and contact the power company if there is continuous fluctuation; 2. If the issue persists after disconnecting all connections and restarting, report for repair

Frequent tripping of circuit breakers: 1. The total power of the connected electrical appliances exceeds the standard; 2. Electrical short circuit; 3. Cable damage and short circuit: 1. Reduce the number of connected electrical appliances and calculate the total power; 2. Disconnect all electrical appliances and connect them one by one to check for short-circuit devices; 3. Check if the cable is damaged and replace the faulty cable


  • Tetra / Alpha 600W H60552 - Switching Power Supply Unit
  • Bruker Alpha FTIR Spectrometer / Alpha-P ATR - Infrared Spectrometer FTIR Instrument
  • Simagic AlphaM-FX-C 290mm FX-C - Formula Steering Wheel with Alpha Mini Wheel Base
  • Alpha Wire 5152C 20/2C - XtraGuard High Performance Instrumentation/Control Cable
  • ALPHA WIRE 1219/40C SL005 - Multi-Conductor Cable Wire
  • ALPHA WIRE 3131441 TN005 - Multi-Conductor Cable Wire
  • ALPHA WIRE 2172-SV005 - Multi-Conductor Cable Wire
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • Olympus Endo Alpha Cart TI-A1 - Medical Equipment Cart with Accessories
  • ALPHA WIRE 74010-BK002 - Multi-Conductor Cable Wire
  • Fanuc A06B-6110-H026#N - ALPHA i Power Supply Module PSM-26i
  • Alpha Laval SX2/013 - Rotary Lobe Pump
  • Alpha II-450P MV4500007B - Switching Power Supply Unit
  • TDK-Lambda / Alpha 400W - Switching Power Supply Unit
  • ALPHA ALPHA6000E-3015GB/3018PB - Frequency Inverter Drive Power Converter
  • ALPHA WIRE 391245-WH005 - Hook-Up Wire
  • Alpha H60562 CA600 - 600W Switching Power Supply Unit
  • Fanuc A06B-0147-B675 - Alpha 22/2000 3.8kW 2000rpm AC Servo Motor
  • ALPHA WIRE 9821 - Twinaxial Cable 1PR 25AWG Poly Insulation
  • Fanuc / Alpha A16B-2203-0820 - ALPHA i Spindle Wiring PCB
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • Fanuc A06B-6096-H104 - Alpha Servo Module
  • Fuji Electric RYT202D5-VV2 / Faldic Alpha5 - Servo Amplifier
  • ALPHA WIRE 2817/6 20 AWG - PTFE High Temperature Cable
  • Aloka Prosound Alpha 10 / EU-6031C / JB-274D - High Voltage Power Supply for Ultrasound
  • Wittenstein Alpha SP 140S-MF1-5-01F-2S - Planetary Gearbox
  • FANUC A06B-6124-H205 - Alpha iSV Servo Amplifier Module
  • TDK-Lambda / Alpha MV6500314A - 650W Power Supply Unit
  • TDK-Lambda / Alpha H47318 - 400W Switching Power Supply Unit
  • Alpha H47318 - 400W Switching Power Supply Unit
  • CNC Bearing / Alpha AR090-S1-300-20-N - Robotics Bearing Component
  • Alpha CA400 5A,3.3Q,5B,12/12E / DXH47037 - 400W Power Supply Unit
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • Fanuc / Amada A04B-0810-C403 / LC1212 alpha II - Pressure Regulator
  • ALPHA WIRE 79012-SL005 - Multi-Conductor Cable Wire
  • Fanuc A06B-0146-B110 0001 - AC Servo Motor Alpha A22/1500 with Brake
  • Wittenstein Alpha SPK140-M3-100 - Planetary Gearbox
  • TDK-Lambda / Alpha H67027 / CA600 - 600W Switching Power Supply Unit
  • Alpha Innotech AlphaArray 7000 - Microarray Reader System
  • FANUC A06B-6117-H211 - Servo Amplifier Module Alpha iSV 160/160 Amp
  • ALPHA WIRE 5021C SL002 - Multi-Conductor Cable Wire
  • Alpha H47318 - 400W Switching Power Supply Unit
  • FANUC A06B-6078-H211#H501 / A06B6078H211H501 - Servo Amplifier Module
  • ALPHA WIRE 1219/40C SL005 - Multi-Conductor Cable Wire
  • Wittenstein Alpha SP-060S-MF1-10-1B1-2S - Planetary Gearbox
  • Beckhoff / Alpha AM3062-0K40-0000 + S100-MF1-10-2K0-2S - Servo Motor with Alpha Transmission
  • FANUC RDCGM00000004O / TP 050-MF1-7-061-000 - Gear Reducer / Alpha Gearbox
  • Basler A102K Alpha VIS - Black and White CCD Industrial Camera
  • Alpha SP 100G-MF1-4-0H1-2S-PGG - Planetary Gear Reducer
  • Fanuc A06B-6096-H306 - Alpha Servo Amplifier Module
  • ALPHA WIRE 5856-VI001 - Hook-Up Wire
  • Simagic FX PRO - Formula Steering Wheel SIM Racing Steering Wheel with Wheelbase
  • Adaptive Micro Systems 10181111 / 4120C - ALPHA ELECTRONIC MESSAGE DISPLAY SIGN
  • ELAU Schneider SH100/40060/0/0/00/00/00/10/00 + SP 075S-MF1-4-0E - AC Servo Motor with Alpha Planetary Gearbox
  • Alpha Wire 5002C-SL001 - Multi-Conductor Cable 2 Conductors 22AWG 300VAC
  • Alpha Wire 5152C 20/2C - XtraGuard High Performance Instrumentation/Control Cable
  • Wittenstein Alpha LPBK 090-M02-5-111 / VIA1001C02A0000 - Gear Box i:5 with Servo Motor
  • ALPHA WIRE 2845/7-RD001 - Hook-Up Wire
  • FANUC A06B-0143-B175 #0275 - Alpha 12/3000 AC Servo Motor
  • Densei-Lambda / Alpha MA4000591A/ME Alpha 400 / MV6500271A Alpha II-650 - Power Supply Unit
  • Siemens / Alpha 1FK7063-5AF71-1SG3 + LP 120-M02-50-111-000 - Servo Motor with Transmission
  • FANUC A06B-6290-H322 - ALPHA iSV 10/10/10HV-B 3-Axis Servo Drive
  • ALPHA WIRE 5021C SL002 - Multi-Conductor Cable Wire
  • Alpha H47016 / CA400 - 400W Switching Power Supply Unit
  • Thermo Scientific RadEye AB100 - Alpha-Beta Contamination Monitor
  • Tigear2 / Ultramite / SM cyclo / IPTS / Dodge / Cone / Boston / Alpha Gear Assortment - Industrial Gears Lot
  • FANUC A06B-6117-H211 - Servo Amplifier Module Alpha iSV 160/160 Amp
  • Lambda / Alpha H40896 - 400W Power Supply Unit
  • Wittenstein Alpha TPM 004F-016V-6PB1-053B-G5 - Rotary Servo Actuator i=16
  • Fanuc A06B-0253-B101 - Alpha 30i AC Servo Motor
  • Alpha VDT100-MF1-40-071-BC / 20018901 - Transmission Gearbox
  • FANUC A06B-6114-H207 - 2-Axis Servo Amplifier Module SVM20/40i Alpha i Series
  • Wittenstein Alpha TK+050S-MF2-50-5G1-1S10 - Right Angle Gearbox 50:1
  • Alpha VDS-063-MF1-4-1X1-AC - Worm Gearbox Reducer
  • Canberra iCam - Alpha/Beta Air Monitor and Pump System
  • Mitsubishi / Alpha HA33NCB-S + HA83NC-S + TP 025-MF1 + MDS-C1-V2-1003 - Servo Assembly with Gearbox and Drive
  • ALPHA WIRE 6363-SL002 - Multi-Conductor Cable Wire
  • Alpha SP 140G-MF2-28-0E1-2S-PGG - Planetary Gear Reducer
  • ALPHA WIRE 2842/19-YL001 - Hook-Up Wire
  • FANUC A20B-2101-0820 - ALPHA iPS Power Control Board
  • FANUC A06B-6117-H205 - Servo Amplifier Module Alpha iSV 20/20 Amp
  • Alpha RP 040S-MA2-27.5-3K1-2S - Planetary Gearbox i=27.5
  • NSS Galaxy / Alpha NSS Galaxy 20 and Alpha 16 - Floor Strip and Wax Slow Speed Buffer and Wet Vac
  • Aloka USM-28 - Ultrasound Machine Component for Prosound Alpha 10
  • Alpha Wire 1219/12C - Multiconductor Shielded Cable Wire 24AWG 1000Ft
  • ALPHA WIRE FIT-321-1-1/2 BK105 - Heat Shrink Tubing Wire Sleeving
  • FANUC A20B-2001-0933 / A20B20010933 - Control Circuit Board PCB
  • Hyva Alpha FC A4.5-3-98-K6-1DA-HC / 70593139 - Dump Body Hydraulic Cylinder
  • Alpha H40042 - 400W Power Supply Unit
  • Titus HVAC 105383-01 - ALPHA BAC Controller and Actuator
  • Siemens / Alpha 1FK6042-6AF71-1EG0 + LP 090-M01-10-111-000 - Servo Motor with Planetary Gearbox
  • FANUC A06B-6096-H204 - Dual Axis Alpha Servo Amplifier Module
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • Hyundai Alpha G4EK - Long Block Engine With Belt
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • Nemoto Dual Shot Alpha - Injector Monitor Part Component
  • Siemens / Alpha 1FK7022-5AK74-1SH3 - Servo Motor
  • Stanley / Alpha QMP controller 21A108721 - Controller Unit 115/230VAC 10AMP
  • Generic 24" Concrete Cutting Hydraulic Walk Behind Push Floor Saw - Concrete Cutting Walk Behind Saw
  • Kawasaki Seibi 9010030042 - Alpha Lubricator Type 8S60MC
  • Hyva Alpha FC A5.5-4-170-K6-HC / 70524267 - Dump Body Hydraulic Cylinder
  • Wittenstein Alpha LP 070-MO2-50-111-000 - Planetary Gear Box Machine Shaft Assembly
  • Tokyo Electron (TEL) Excess Temp Box with Harness - Diffusion Furnace Component
  • FANUC A06B-6089-H204 - Alpha Series Servo Amplifier Module
  • Stanley / Alpha QMP controller 21A108721 - Controller Unit 115/230VAC 10AMP
  • Alpha H60638 - 600W Switching Power Supply Unit
  • Olympus Endo Alpha Cart TI-A1 - Medical Equipment Cart with Accessories
  • ALPHA ALPHA6000-3015JB - Frequency Inverter Drive Power Converter
  • ALPHA WIRE 74010-BK002 - Multi-Conductor Cable Wire
  • Fanuc RoboCut α-0iD Series - CNC Wire EDM Machine
  • FANUC A06B-6124-H207 - Alpha iSV Servo Amplifier Module
  • ALPHA WIRE 2172-SV005 - Multi-Conductor Cable Wire
  • FANUC A06B-6079-H101 - Servo Amplifier Module Alpha 12
  • Alpha Wire Apr-19 - High Low Temperature Cable 75 FT
  • ALPHA WIRE 6717-RD001 - Hook Up Wire Stranded 14 AWG 600V mPPE
  • Alpha Technologies CXPS-E3 200A - 400A / 0919006-001 - Power System Rectifier
  • Wittenstein Alpha LP 090-M01-7-111-000 / Schneider - Gear Box i:7 Schneider Electric Servo Motor
  • Christ Alpha 1-2 LD plus - Lyophilizer Freeze Drier
  • Ojeda USA ALPA-55 G2 - Alpha Open Air Merchandiser Grab and Go Display Case
  • Wittenstein Alpha SPK140 MF2-10-051-000 - Bevel Planetary Gearbox Reducer
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • FANUC A06B-6096-H106 - ALPHA SERVO MODULE SVM1-130 Series
  • Alpha & Omega AOD442 - N-Channel MOSFET Reel Surface Mount
  • Wittenstein Alpha SPK 100-MF2-20-141-000 - Right Angle Gear Reducer 20:1 Ratio
  • FANUC A20B-2100-0742 - ALPHA ia Servo Control Board
  • ALPHA WIRE 5470C-SL005 - Multi-Conductor Cable Wire
  • B&L Biotech Alpha II - Endodontic Starter Kit
  • Digital Alpha VME 5/480 - VME SBC Motherboard CPU Board