K-WANG

+086-15305925923
Service expert in industrial control field!
NameDescriptionContent
Adequate Inventory, Timely Service
pursuit of excellence 
Ship control system
Equipment control system
Power monitoring system
Current position:
新闻动态
newS
   
Brand

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

From: | Author:Wang | Time :2025-11-13 | 435 visit: | 🔊 Click to read aloud ❚❚ | Share:

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

Core parameters and compatibility

1. Key specifications

Output parameters: 120V, 20A, 60Hz, maximum output power matching generator operating power of 2400W.

Input parameters: Grid input 120V 20A 60Hz, generator input 120V 20A 60Hz (equipped with L14-30P plug).

Interface configuration: 120V 20A 5-20R dual socket, grid power input port, generator control cable interface, 25 foot generator power cord.

Protection configuration: 20A circuit breaker to prevent overload damage to equipment.

2. Compatibility requirements

Only compatible with Westinghouse generators with "Smart Switch Ready" interface, not compatible with other brands or generators without this interface.

Do not use in series with other conversion switches, do not connect GFCI sockets or use socket adapters.


Core functions and working principles

1. Full process working mechanism

(1) When the power grid is normal (standby mode)

Power supply path: grid power supply → transfer switch → connected electrical appliances. At this time, the green "grid power indicator light" is constantly on.

Additional function: The generator battery is continuously charged by the power grid through the generator control cable, ensuring that the generator battery is fully charged and can be started at any time.

Key state: The generator is in the "RUN" position but not starting, only the battery charging circuit is working.

(2) When the power grid is cut off (emergency power supply state)

Trigger mechanism: When the conversion switch detects a power outage in the power grid, the red "power grid interruption indicator light" immediately lights up.

Start up process: After a delay of 5-10 seconds (to avoid accidental triggering due to instantaneous fluctuations in the power grid), send a start signal to the generator through the control cable, and the generator will automatically start and enter a stable operating state.

Switching power supply: After the generator output stabilizes (within about 30 seconds), the transfer switch automatically cuts off the power grid circuit and connects the generator power supply circuit. The green "generator power indicator light" lights up, and the electrical appliances are powered by the generator.

(3) When the power grid is restored (switching and cooling state)

Detection process: After the power grid is restored, the transfer switch first undergoes a 5-10 second stability test (to prevent frequent switching caused by voltage fluctuations in the power grid), and at this time, the red and green indicator lights are constantly on.

Switching power supply: After confirming the stability of the power grid, cut off the generator power supply circuit, connect the power grid circuit, the red "power grid interruption indicator light" will turn off, and the electrical appliances will resume power supply to the grid.

Cooling shutdown: The switch keeps the generator running for 45-50 seconds during the cooling period to avoid damage to the engine caused by high-temperature shutdown. After the cooling is complete, the generator will automatically shut down and the green "generator power indicator light" will turn off.

2. Full analysis of indicator lights (including abnormal states)

Description of indicator light combination status and operation suggestions

Only the green grid light stays on and is in normal standby mode. The power is supplied by the grid, and there is no need to operate the generator battery during charging. Regularly check the cable connections

Only the red power grid interruption light remains on. The power grid has been cut off, and we are waiting to start the generator to confirm that the fuel and oil are sufficient and there are no fault alarms

Only the green generator light is constantly on, and the power grid has not been restored to monitor the operation status of the generator to ensure sufficient fuel supply

The traffic lights are constantly on at the same time, and the power grid has been restored. Stability testing will be conducted and wait for 5-10 seconds without manual intervention

The green light stays on and the red light flashes. The power grid is restored but the voltage is unstable. Keep observing. If it does not return to normal within 1 minute, check the power grid line

The generator light is constantly on+the grid light is flashing. The generator power supply is normal, and the grid is in a fluctuating state without operation. The transfer switch will continue to monitor the grid

No indicator light is on, the conversion switch is not connected to the power grid, or there is an internal fault. Check if the power grid connection line is tightly plugged in. If the connection is normal, it needs to be reported for repair

Safety operation standards (including risk avoidance)

1. Installation and placement safety

Generator placement requirements:

It must be placed in an outdoor ventilated area, at least 15 feet (about 4.6 meters) away from the doors, windows, and ventilation openings of the house, to prevent carbon monoxide exhaust from entering the room.

Place on a hard, level surface to avoid tilting and causing fuel leakage; Keep a safe distance of at least 3 feet (approximately 0.9 meters) away from flammable materials such as hay, wood, and paint.

It is prohibited to place the generator on rainy, snowy, or damp ground. A temporary rain shelter (not enclosed) must be built to prevent rainwater from entering the generator and causing a short circuit.

Requirements for placement of transfer switch:

Only suitable for indoor use, placed in a dry, ventilated, away from water sources (such as kitchens, bathrooms) and flammable materials.

Do not place it in areas prone to water accumulation such as basements and low-lying areas to avoid equipment short circuits caused by floods or water leaks.

The placement height should be at least 1 foot (about 0.3 meters) above the ground to prevent moisture erosion on the ground.

2. Cable connection safety

Connection sequence: The power grid must be connected first, then the generator control cable, and finally the generator power line. It is forbidden to reverse the sequence.

Cable requirements:

Grid input extension cable: A grounded three core cable with no damage or aging is required, with a length not exceeding 30 feet (approximately 9.1 meters) and a core cross-sectional area of ≥ 1.5mm ².

Generator control/power cord: The total length should not exceed 50 feet (approximately 15.2 meters). If extension is required, Westinghouse original extension cords (model 3021225C is the power cord extension cord, STCORD25 is the control cable extension cord) must be used. Non original cables are prohibited.

Connection operation:

All connections must be made after the generator is turned off and cooled down, and the plug must be fully inserted into the interface and locked to avoid loosening and overheating.

After connection, check that the cables are not twisted or compressed, and keep them away from high-temperature components such as the generator exhaust pipe to prevent cable aging.

3. Safety of electrical loads

Load accounting rules:

Pure resistance load (light bulb, heater, rice cooker): total operating power ≤ 20A × 120V=2400W.

Inductive loads (motors: refrigerators, water pumps, air conditioners): starting power=operating power multiplied by multiple (small handheld devices multiplied by 1.2, large fixed devices multiplied by 3.5), total starting power ≤ 2400W.

Example: 1500W space heater (pure resistor)+700W refrigerator (starting power 700 × 3.5=2450W), total starting power 2450W>2400W, cannot be connected simultaneously; 1500W heater+500W furnace (starting power 500 × 1.2=600W), total starting power 2100W ≤ 2400W, can be connected simultaneously.

Taboo for load connection:

Prohibit the connection of electrical appliances with unknown power to avoid overload triggering circuit breaker tripping.

It is prohibited to simultaneously connect multiple large inductive loads (such as two air conditioners, one water pump+one air conditioner) to prevent excessive starting power.

When connecting electrical appliances, it is necessary to first turn off the electrical switch and then turn it on again to avoid arcing caused by load insertion and removal.

4. Emergency safety handling

Generator malfunction unable to start: Immediately disconnect the transfer switch from the generator, manually start the generator to troubleshoot (such as low fuel, low oil, spark plug malfunction), and reconnect after troubleshooting.

The transfer switch does not switch the power supply: check the status of the indicator light. If the red light is on after the power grid is cut off but the generator does not start, check the connection of the control cable; If the green light does not turn on after the generator is started, check the power cord connection and restart the transfer switch if necessary (unplug the power grid for 30 seconds and then reinsert it).

Fire/Leakage Emergency: Immediately shut down the generator, unplug all connecting wires of the transfer switch, and use ABE or BE class fire extinguishers to extinguish the fire (water is prohibited from extinguishing electrical fires); If electric shock occurs, immediately cut off the power and seek medical attention.


Operation process (setup+testing+daily use)

1. Initial process setup (required steps)

Generator preparation:

Place the generator in a safe outdoor location, check that the fuel (unleaded gasoline) and engine oil (four stroke engine oil that meets the requirements of the generator) levels are normal, and that the battery connection is secure.

Start the generator and test it to run normally independently. After confirming that there are no fault alarms, turn it off and cool it down to room temperature.

Switch connection:

Place the transfer switch in a dry indoor location, connect the grid power supply to the "grid power input port" of the transfer switch with a grounding extension wire, and the green grid indicator light will light up at this time.

Connect the generator control cable: Insert one end into the "Smart Switch Ready" interface of the generator and the other end into the "Control Cable Interface" of the conversion switch. You can hear the locking sound of the buckle.

Connect the generator power cord: Insert the 25 foot power cord L14-30P plug that comes with the conversion switch into the generator L14-30R socket, and tighten the fixing nut.

Electrical connections and generator settings:

Connect the electrical appliances that require emergency power supply (such as refrigerators and heaters) to the 120V dual socket of the conversion switch to ensure that the total power does not exceed the standard.

Turn on the "RUN" switch of the generator, confirm that the generator battery indicator light is on (indicating that the charging circuit is normal), and complete the first setting.

2. Functional testing process (must be done before first use)

Test purpose: To verify that the automatic switching function of the transfer switch is normal and to avoid failure in emergency situations.

Test preparation: Ensure all connections are complete, connect a small appliance (such as a desk lamp, phone charger), and confirm that the appliance is powered by the power grid normally.

Simulated power-off test:

Unplug the power grid input extension line of the conversion switch and simulate a power outage in the power grid.

Observe the indicator light: The red power grid interruption light will immediately turn on, and the generator will automatically start after 5-10 seconds.

Confirm switch: About 30 seconds after the generator starts, the green generator light will turn on, and the electrical appliances will be powered by the generator normally.

Simulated recovery test:

Re insert the power grid input extension line to simulate power grid recovery.

Observe the indicator lights: both traffic and green lights remain on (5-10 second detection period), then the red light goes out and the electrical appliances resume power supply to the grid.

Confirm shutdown: Wait for 45-50 seconds, the generator will automatically shut down, the green generator light will turn off, and the test is complete.

Exception handling: If a step in the test is not executed as expected, check if the cable connection is secure and if the generator is in the "RUN" position. After troubleshooting, retest.

3. Daily use and emergency activation process

(1) Daily maintenance (non emergency state)

Every month: Check if all cable connections are secure, without damage or aging; Start the generator and run it for 10 minutes to ensure that there are no faults in the generator.

Every 6 months: Conduct a complete test of the transfer switch according to the "functional testing process" to ensure that the automatic switching function is normal; Check the battery level of the generator and recharge it if necessary.

Long term use (exceeding 3 months): Disconnect the transfer switch from the power grid and generator, store the transfer switch in a dry environment, and maintain the generator according to long-term storage requirements.

(2) Emergency use (sudden power outage in the power grid)

No manual operation required: The switch automatically completes the entire process of "detecting power failure → starting the generator → switching power supply".

Key monitoring: Observe the status of the conversion switch indicator light and confirm that it switches as expected; Monitor the fuel level of the generator and replenish fuel if necessary under safe conditions (operate after shutting down the generator and cooling it down).

After the power grid is restored: without intervention, the transfer switch automatically switches back to the grid and shuts down the generator. After the generator cools down, its "RUN" switch can be turned off (or kept on for the next emergency start).


Maintenance and Warranty

1. Key points of maintenance and upkeep

Switch maintenance:

Cleaning: Use a dry cloth to wipe away surface dust. Do not use water or solvents for cleaning to prevent liquids from entering the interface.

Storage: When not in use for a long time, disconnect all connections and place in a dry, ventilated storage box, avoiding direct sunlight and high temperature and humidity environments.

Testing: Conduct a functional test every 6 months to ensure that there are no faults in the internal circuit.

Cable maintenance:

Regularly inspect the cable sheath for any damage or cracking, and ensure that the plug has no signs of oxidation or erosion.

Avoid excessive bending and squeezing during storage to prevent internal core breakage; The generator end cable should be kept away from high-temperature components such as exhaust pipes.

2. Detailed explanation of warranty policy

Warranty period: 1 year from the date of purchase, covering faults caused by material and process defects.

Warranty scope: For quality issues with the main body of the conversion switch and original cables (control cables, power cords), free repair or replacement of faulty components is provided.

Not covered by warranty:

Human damage (such as falling, collision, liquid immersion, overload use).

Unauthorized maintenance and modification (such as splicing cables, replacing non original components).

Normal wear and tear (such as plug contact wear), damage caused by natural disasters or accidents.

Malfunctions caused by failure to follow the manual, such as connecting incompatible generators or illegally extending cables.


Common troubleshooting

Possible causes and solutions for fault phenomena

The generator does not start after the power grid is cut off. 1. The control cable is not properly connected; 2. Insufficient battery power in the generator; 3. The generator is in the "OFF" position; 4. Generator malfunction (insufficient fuel/oil, alarm lock) 1. Check if the control cable plug is securely plugged in; 2. Manually start the generator to charge the battery or replace the battery; 3. Confirm that the generator is in the "RUN" position; 4. Check for generator faults and solve them according to the generator manual

The power supply is not switched after the generator is started. 1. The power cord is not properly connected; 2. Generator output fault; 3. Overload protection trip of transfer switch 1. Check if the power cord plug is tightened; 2. Disconnect the conversion switch and directly use the generator to supply power to the electrical appliance, verifying the output of the generator; 3. Disconnect part of the load and press the reset button of the circuit breaker on the transfer switch

After the power grid is restored, it will not switch back to the grid. 1. The voltage of the power grid is unstable; 2. Switch detection circuit fault 1. Use a multimeter to measure the grid voltage (normal 110-130V) and eliminate the grid problem; 2. Restart the conversion switch (unplug for 30 seconds and then reinsert), if it still does not work, report for repair

Abnormal flashing of indicator light: 1. Grid voltage fluctuation; 2. Internal circuit failure of the transfer switch. 1. Observe the restoration of the power grid and contact the power company if there is continuous fluctuation; 2. If the issue persists after disconnecting all connections and restarting, report for repair

Frequent tripping of circuit breakers: 1. The total power of the connected electrical appliances exceeds the standard; 2. Electrical short circuit; 3. Cable damage and short circuit: 1. Reduce the number of connected electrical appliances and calculate the total power; 2. Disconnect all electrical appliances and connect them one by one to check for short-circuit devices; 3. Check if the cable is damaged and replace the faulty cable


  • Beckhoff CX1020-0111 - servo driver
  • Beckhoff CX2020-0125 - Controller Unit
  • Beckhoff EK1818 - EtherCAT Coupler 8DI 4DO 24VDC
  • Beckhoff CX2500-0030 - System Module
  • Beckhoff AM3121-0200-0001 - servo motor
  • Beckhoff C5102 - IP-4GVI63 REV:1.0 IPC
  • B&R X67AT1322 - PLC module
  • Beckhoff BK7000 - EtherCAT bus coupler
  • Beckhoff CX1100-0930 - Module
  • Beckhoff CX2500-0060 - Relay Power Capacitor Module
  • Beckhoff CX5130-0175 - Controller Module
  • Beckhoff CP6801-1006-0010 - CONTROL PANEL (US)
  • Beckhoff CX5020-0112 - Programmable Controller Module
  • Beckhoff EPP6228-0022 - EtherCAT P-Box 8 Channel Communication Interface
  • Beckhoff CX5130-0125-1001/000119452 - Controller Module
  • B&R X20AT6402 - Temperature Input Module
  • Beckhoff C6920-1025-0020 - PC
  • Beckhoff CX1000-0011 - PLC Module
  • Beckhoff KL3011 - PLC Module
  • Beckhoff BK7300 - Programmable Logic Controller Module
  • Beckhoff KL3001 - PLC module
  • Beckhoff CX1100-0910 - Power Supply Module
  • Unknown JM-204-480-OEM-S1 - Servo Drive
  • Beckhoff C6015-0010 - Quad Core Controller
  • Beckhoff CX1001-0121 - Embedded PC And CPU Basic Module Controller
  • Beckhoff CP3912-0000 - B&F Control Panel
  • Beckhoff FC3102-0000 - PROFIBUS communication module
  • Beckhoff CX5120-0120 - PLC module HTP0
  • Schneider 140CPU65260 - PLC CPU Module
  • Beckhoff CP6932-0001-0000 - Control Panel
  • Beckhoff AX5112-0000-0200 - Servo Drive
  • Beckhoff CX2020-0112 - Controller module
  • Beckhoff AM237M-0020 - Motor Drive
  • Beckhoff EK9300 - bus module
  • AB 20F11NC3P5JA0NNNNN - AC Drive
  • Beckhoff CU2016 - Ethernet switch
  • Beckhoff CX1100-0004 - Power Supply Module
  • Beckhoff CP3916-0000 - touch screen
  • Beckhoff CX5020-0111 - Controller module
  • Beckhoff AM3032-0C30-0000 - Servo Motor HTP0
  • Beckhoff CX5140-0175 - Embedded PC
  • Beckhoff AM8121-1F20-1001 - Servo Motor
  • Beckhoff CU2508-0000 - 8-Port-Port-Multiplier
  • B&R X67BC8331 - Industrial Automation X67 SYSTEM
  • Beckhoff EK1100 - EL2202 EL1904 EL1809 EL9189 EL9188 EL2809 EL3122 EL3102 EL4102 PLC Modules
  • Beckhoff CP6812-0000-0010 - LQ150X1LW71N Control Panel
  • Beckhoff AX5112-0000-0200 - Servo Driver
  • Beckhoff EL3051 - module
  • Beckhoff CX5020-0112 - CPU Base Unit Module
  • KUKA 00-216-801 - KRC4 KCP4 Teach Pendant Smartpad Control Panel
  • Unknown 8253.84.2117 - 0-400bar Switch
  • Beckhoff IE2302 - PLC Module
  • BECKHOFF EL6751-0000 - PLC Module
  • B&R 3NC154.60-2 - PLC
  • BECKHOFF EL4002 - Module
  • Beckhoff EPP6228-0022 - IO-Link Module
  • BECKHOFF EK1914 - module
  • Allen-Bradley 25B-E019N104 - Frequency changer
  • Beckhoff CB3055-0004 - Industrial motherboard
  • BECKHOFF FC5201-0000 - Card
  • BECKHOFF C6015-0010 - controller
  • BECKHOFF BK4020 - Modules
  • Beckhoff CP2916-0000 with C6920-0040 - Control Panel with PC
  • BECKHOFF CX5140-0111/000001884 - module
  • Beckhoff CU8810-0000 - Module
  • Beckhoff EL3068 - PLC Moudule
  • BECKHOFF AX5103-0000-0200 - Servo driver
  • Beckhoff EL1862-0010 - Module
  • Beckhoff CX5140-0135 - Controller Module
  • BECKHOFF AX5106-0000-0202 - Servo Drive
  • Beckhoff CX1020-0112 - CPU controller
  • Siemens 6ES7134-0HF01-0XB0 - Electronic module
  • Beckhoff EP9128-0021 - module
  • Beckhoff CP7912-0001-0000 LQ150X1LW71N - 15" Touch Panel
  • Beckhoff EPP1322-0001 - Module
  • BECKHOFF AM3031-0C01-0000 - servo motor
  • MOELLER EATON NZMB2-A160 - Circuit Breaker
  • Allen-Bradley 1769-L23E-QBFC1B - CMPLX 512KB Enet DI/O AI/O Controller
  • Beckhoff AX2523-B200 S403BA-LB-520 - Servo Drive
  • BECKHOFF KL5121-0010 - PLC Module
  • BECKHOFF EP2328-0002 - module
  • Beckhoff CX1020-0012 - Basic CPU Module HW 6.9
  • Beckhoff EL6631 - Communication Module
  • BECKHOFF CX5130-0125-4GB - Module
  • Beckhoff CX5140-0155 - Controller Module
  • beckhoff EL6224-1007 - PLC Modules
  • BECKHOFF CU1128 - Module
  • B&R 6PPT50.101E-16B - Panel
  • BECKHOFF EL6910 - module
  • BECKHOFF CX8090 - PLC Module
  • BECKHOFF EL6632 - PLC Module
  • beckhoff FM3332-B310-0000 - Thermoelectric Module
  • BECKHOFF CP6701-0001-0050 - Touch Screen
  • Beckhoff CP3915-0000 - 15" Multi-touch Control Panel with mounting arm, DVI/USB
  • Beckhoff EL3351 - Module
  • Beckhoff C6030-0060 - Ultra-Compact Industrial PC
  • Beckhoff EL1918 - 8 xTwinSAFE Input
  • Beckhoff CX5120-0112 - Safety switch module
  • Beckhoff CB3052-0005 - Circuitboard
  • Beckhoff EL7211-0010 - Module
  • BECKHOFF CX2020-0120 - Module
  • BECKHOFF CU2016 - 16 Port Ethernet Switch
  • Beckhoff CP6801-0001-0000 - Touch Panal
  • Beckhoff EL2904 - PLC Module
  • Beckhoff CX1020-0112 - CPU controller
  • Beckhoff EL4102 - 16BIT Analog Output
  • BECKHOFF AX5112-0000-0200 - Servo Driver
  • BECKHOFF AM3032-0C30-0000 - servo motor
  • BECKHOFF CP6702-0001 - Open Interface Panels
  • BECKHOFF BK7200 - PLC
  • BECKHOFF CP3919-1008-0011 - CONTROL PANEL
  • BECKHOFF CX5130-0112/000002403 - Host module
  • Allen-Bradley 2094-AM02-S - Kinetix 6000 Axis Module
  • BECKHOFF CX1100-0910 - Power Supply Module
  • BECKHOFF C5101-0030 - SPS Processor
  • BECKHOFF CP3918-1039-0010 - Control Panel
  • Beckhoff CX2100-0914 - External UPS Power Supply for CX20xx
  • B&R X67DM1321.L12 - Module
  • BECKHOFF AX5106-0000-0202 - Servo Drive
  • BECKHOFF AM3031-0C20-0000 - SERVO MOTOR
  • Beckhoff EL7211-0010 - PLC Module
  • Beckhoff EL4031 - I/O Module
  • Beckhoff CX5140-0125 - Module 8GB CF Card
  • Beckhoff EL1918 - EtherCAT Terminal, 8 Channel Digital Input, TwinSAFE
  • BECKHOFF C6640-0040 - Industrial Computer
  • Beckhoff EL3692 - 2 x Resistor Measuring Terminal Rev. No: 0021
  • BECKHOFF IE1001-0000 - module
  • BECKHOFF CX2100-0014 - Module