+086-15305925923

K-WANG

Service expert in industrial control field!
NameDescriptionContent
Adequate Inventory, Timely Service
pursuit of excellence 
Ship control system
Equipment control system
Power monitoring system
Current position:
新闻动态
newS
   
Brand

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

From: | Author:Wang | Time :2025-11-13 | 280 visit: | 🔊 Click to read aloud ❚❚ | Share:

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

Core parameters and compatibility

1. Key specifications

Output parameters: 120V, 20A, 60Hz, maximum output power matching generator operating power of 2400W.

Input parameters: Grid input 120V 20A 60Hz, generator input 120V 20A 60Hz (equipped with L14-30P plug).

Interface configuration: 120V 20A 5-20R dual socket, grid power input port, generator control cable interface, 25 foot generator power cord.

Protection configuration: 20A circuit breaker to prevent overload damage to equipment.

2. Compatibility requirements

Only compatible with Westinghouse generators with "Smart Switch Ready" interface, not compatible with other brands or generators without this interface.

Do not use in series with other conversion switches, do not connect GFCI sockets or use socket adapters.


Core functions and working principles

1. Full process working mechanism

(1) When the power grid is normal (standby mode)

Power supply path: grid power supply → transfer switch → connected electrical appliances. At this time, the green "grid power indicator light" is constantly on.

Additional function: The generator battery is continuously charged by the power grid through the generator control cable, ensuring that the generator battery is fully charged and can be started at any time.

Key state: The generator is in the "RUN" position but not starting, only the battery charging circuit is working.

(2) When the power grid is cut off (emergency power supply state)

Trigger mechanism: When the conversion switch detects a power outage in the power grid, the red "power grid interruption indicator light" immediately lights up.

Start up process: After a delay of 5-10 seconds (to avoid accidental triggering due to instantaneous fluctuations in the power grid), send a start signal to the generator through the control cable, and the generator will automatically start and enter a stable operating state.

Switching power supply: After the generator output stabilizes (within about 30 seconds), the transfer switch automatically cuts off the power grid circuit and connects the generator power supply circuit. The green "generator power indicator light" lights up, and the electrical appliances are powered by the generator.

(3) When the power grid is restored (switching and cooling state)

Detection process: After the power grid is restored, the transfer switch first undergoes a 5-10 second stability test (to prevent frequent switching caused by voltage fluctuations in the power grid), and at this time, the red and green indicator lights are constantly on.

Switching power supply: After confirming the stability of the power grid, cut off the generator power supply circuit, connect the power grid circuit, the red "power grid interruption indicator light" will turn off, and the electrical appliances will resume power supply to the grid.

Cooling shutdown: The switch keeps the generator running for 45-50 seconds during the cooling period to avoid damage to the engine caused by high-temperature shutdown. After the cooling is complete, the generator will automatically shut down and the green "generator power indicator light" will turn off.

2. Full analysis of indicator lights (including abnormal states)

Description of indicator light combination status and operation suggestions

Only the green grid light stays on and is in normal standby mode. The power is supplied by the grid, and there is no need to operate the generator battery during charging. Regularly check the cable connections

Only the red power grid interruption light remains on. The power grid has been cut off, and we are waiting to start the generator to confirm that the fuel and oil are sufficient and there are no fault alarms

Only the green generator light is constantly on, and the power grid has not been restored to monitor the operation status of the generator to ensure sufficient fuel supply

The traffic lights are constantly on at the same time, and the power grid has been restored. Stability testing will be conducted and wait for 5-10 seconds without manual intervention

The green light stays on and the red light flashes. The power grid is restored but the voltage is unstable. Keep observing. If it does not return to normal within 1 minute, check the power grid line

The generator light is constantly on+the grid light is flashing. The generator power supply is normal, and the grid is in a fluctuating state without operation. The transfer switch will continue to monitor the grid

No indicator light is on, the conversion switch is not connected to the power grid, or there is an internal fault. Check if the power grid connection line is tightly plugged in. If the connection is normal, it needs to be reported for repair

Safety operation standards (including risk avoidance)

1. Installation and placement safety

Generator placement requirements:

It must be placed in an outdoor ventilated area, at least 15 feet (about 4.6 meters) away from the doors, windows, and ventilation openings of the house, to prevent carbon monoxide exhaust from entering the room.

Place on a hard, level surface to avoid tilting and causing fuel leakage; Keep a safe distance of at least 3 feet (approximately 0.9 meters) away from flammable materials such as hay, wood, and paint.

It is prohibited to place the generator on rainy, snowy, or damp ground. A temporary rain shelter (not enclosed) must be built to prevent rainwater from entering the generator and causing a short circuit.

Requirements for placement of transfer switch:

Only suitable for indoor use, placed in a dry, ventilated, away from water sources (such as kitchens, bathrooms) and flammable materials.

Do not place it in areas prone to water accumulation such as basements and low-lying areas to avoid equipment short circuits caused by floods or water leaks.

The placement height should be at least 1 foot (about 0.3 meters) above the ground to prevent moisture erosion on the ground.

2. Cable connection safety

Connection sequence: The power grid must be connected first, then the generator control cable, and finally the generator power line. It is forbidden to reverse the sequence.

Cable requirements:

Grid input extension cable: A grounded three core cable with no damage or aging is required, with a length not exceeding 30 feet (approximately 9.1 meters) and a core cross-sectional area of ≥ 1.5mm ².

Generator control/power cord: The total length should not exceed 50 feet (approximately 15.2 meters). If extension is required, Westinghouse original extension cords (model 3021225C is the power cord extension cord, STCORD25 is the control cable extension cord) must be used. Non original cables are prohibited.

Connection operation:

All connections must be made after the generator is turned off and cooled down, and the plug must be fully inserted into the interface and locked to avoid loosening and overheating.

After connection, check that the cables are not twisted or compressed, and keep them away from high-temperature components such as the generator exhaust pipe to prevent cable aging.

3. Safety of electrical loads

Load accounting rules:

Pure resistance load (light bulb, heater, rice cooker): total operating power ≤ 20A × 120V=2400W.

Inductive loads (motors: refrigerators, water pumps, air conditioners): starting power=operating power multiplied by multiple (small handheld devices multiplied by 1.2, large fixed devices multiplied by 3.5), total starting power ≤ 2400W.

Example: 1500W space heater (pure resistor)+700W refrigerator (starting power 700 × 3.5=2450W), total starting power 2450W>2400W, cannot be connected simultaneously; 1500W heater+500W furnace (starting power 500 × 1.2=600W), total starting power 2100W ≤ 2400W, can be connected simultaneously.

Taboo for load connection:

Prohibit the connection of electrical appliances with unknown power to avoid overload triggering circuit breaker tripping.

It is prohibited to simultaneously connect multiple large inductive loads (such as two air conditioners, one water pump+one air conditioner) to prevent excessive starting power.

When connecting electrical appliances, it is necessary to first turn off the electrical switch and then turn it on again to avoid arcing caused by load insertion and removal.

4. Emergency safety handling

Generator malfunction unable to start: Immediately disconnect the transfer switch from the generator, manually start the generator to troubleshoot (such as low fuel, low oil, spark plug malfunction), and reconnect after troubleshooting.

The transfer switch does not switch the power supply: check the status of the indicator light. If the red light is on after the power grid is cut off but the generator does not start, check the connection of the control cable; If the green light does not turn on after the generator is started, check the power cord connection and restart the transfer switch if necessary (unplug the power grid for 30 seconds and then reinsert it).

Fire/Leakage Emergency: Immediately shut down the generator, unplug all connecting wires of the transfer switch, and use ABE or BE class fire extinguishers to extinguish the fire (water is prohibited from extinguishing electrical fires); If electric shock occurs, immediately cut off the power and seek medical attention.


Operation process (setup+testing+daily use)

1. Initial process setup (required steps)

Generator preparation:

Place the generator in a safe outdoor location, check that the fuel (unleaded gasoline) and engine oil (four stroke engine oil that meets the requirements of the generator) levels are normal, and that the battery connection is secure.

Start the generator and test it to run normally independently. After confirming that there are no fault alarms, turn it off and cool it down to room temperature.

Switch connection:

Place the transfer switch in a dry indoor location, connect the grid power supply to the "grid power input port" of the transfer switch with a grounding extension wire, and the green grid indicator light will light up at this time.

Connect the generator control cable: Insert one end into the "Smart Switch Ready" interface of the generator and the other end into the "Control Cable Interface" of the conversion switch. You can hear the locking sound of the buckle.

Connect the generator power cord: Insert the 25 foot power cord L14-30P plug that comes with the conversion switch into the generator L14-30R socket, and tighten the fixing nut.

Electrical connections and generator settings:

Connect the electrical appliances that require emergency power supply (such as refrigerators and heaters) to the 120V dual socket of the conversion switch to ensure that the total power does not exceed the standard.

Turn on the "RUN" switch of the generator, confirm that the generator battery indicator light is on (indicating that the charging circuit is normal), and complete the first setting.

2. Functional testing process (must be done before first use)

Test purpose: To verify that the automatic switching function of the transfer switch is normal and to avoid failure in emergency situations.

Test preparation: Ensure all connections are complete, connect a small appliance (such as a desk lamp, phone charger), and confirm that the appliance is powered by the power grid normally.

Simulated power-off test:

Unplug the power grid input extension line of the conversion switch and simulate a power outage in the power grid.

Observe the indicator light: The red power grid interruption light will immediately turn on, and the generator will automatically start after 5-10 seconds.

Confirm switch: About 30 seconds after the generator starts, the green generator light will turn on, and the electrical appliances will be powered by the generator normally.

Simulated recovery test:

Re insert the power grid input extension line to simulate power grid recovery.

Observe the indicator lights: both traffic and green lights remain on (5-10 second detection period), then the red light goes out and the electrical appliances resume power supply to the grid.

Confirm shutdown: Wait for 45-50 seconds, the generator will automatically shut down, the green generator light will turn off, and the test is complete.

Exception handling: If a step in the test is not executed as expected, check if the cable connection is secure and if the generator is in the "RUN" position. After troubleshooting, retest.

3. Daily use and emergency activation process

(1) Daily maintenance (non emergency state)

Every month: Check if all cable connections are secure, without damage or aging; Start the generator and run it for 10 minutes to ensure that there are no faults in the generator.

Every 6 months: Conduct a complete test of the transfer switch according to the "functional testing process" to ensure that the automatic switching function is normal; Check the battery level of the generator and recharge it if necessary.

Long term use (exceeding 3 months): Disconnect the transfer switch from the power grid and generator, store the transfer switch in a dry environment, and maintain the generator according to long-term storage requirements.

(2) Emergency use (sudden power outage in the power grid)

No manual operation required: The switch automatically completes the entire process of "detecting power failure → starting the generator → switching power supply".

Key monitoring: Observe the status of the conversion switch indicator light and confirm that it switches as expected; Monitor the fuel level of the generator and replenish fuel if necessary under safe conditions (operate after shutting down the generator and cooling it down).

After the power grid is restored: without intervention, the transfer switch automatically switches back to the grid and shuts down the generator. After the generator cools down, its "RUN" switch can be turned off (or kept on for the next emergency start).


Maintenance and Warranty

1. Key points of maintenance and upkeep

Switch maintenance:

Cleaning: Use a dry cloth to wipe away surface dust. Do not use water or solvents for cleaning to prevent liquids from entering the interface.

Storage: When not in use for a long time, disconnect all connections and place in a dry, ventilated storage box, avoiding direct sunlight and high temperature and humidity environments.

Testing: Conduct a functional test every 6 months to ensure that there are no faults in the internal circuit.

Cable maintenance:

Regularly inspect the cable sheath for any damage or cracking, and ensure that the plug has no signs of oxidation or erosion.

Avoid excessive bending and squeezing during storage to prevent internal core breakage; The generator end cable should be kept away from high-temperature components such as exhaust pipes.

2. Detailed explanation of warranty policy

Warranty period: 1 year from the date of purchase, covering faults caused by material and process defects.

Warranty scope: For quality issues with the main body of the conversion switch and original cables (control cables, power cords), free repair or replacement of faulty components is provided.

Not covered by warranty:

Human damage (such as falling, collision, liquid immersion, overload use).

Unauthorized maintenance and modification (such as splicing cables, replacing non original components).

Normal wear and tear (such as plug contact wear), damage caused by natural disasters or accidents.

Malfunctions caused by failure to follow the manual, such as connecting incompatible generators or illegally extending cables.


Common troubleshooting

Possible causes and solutions for fault phenomena

The generator does not start after the power grid is cut off. 1. The control cable is not properly connected; 2. Insufficient battery power in the generator; 3. The generator is in the "OFF" position; 4. Generator malfunction (insufficient fuel/oil, alarm lock) 1. Check if the control cable plug is securely plugged in; 2. Manually start the generator to charge the battery or replace the battery; 3. Confirm that the generator is in the "RUN" position; 4. Check for generator faults and solve them according to the generator manual

The power supply is not switched after the generator is started. 1. The power cord is not properly connected; 2. Generator output fault; 3. Overload protection trip of transfer switch 1. Check if the power cord plug is tightened; 2. Disconnect the conversion switch and directly use the generator to supply power to the electrical appliance, verifying the output of the generator; 3. Disconnect part of the load and press the reset button of the circuit breaker on the transfer switch

After the power grid is restored, it will not switch back to the grid. 1. The voltage of the power grid is unstable; 2. Switch detection circuit fault 1. Use a multimeter to measure the grid voltage (normal 110-130V) and eliminate the grid problem; 2. Restart the conversion switch (unplug for 30 seconds and then reinsert), if it still does not work, report for repair

Abnormal flashing of indicator light: 1. Grid voltage fluctuation; 2. Internal circuit failure of the transfer switch. 1. Observe the restoration of the power grid and contact the power company if there is continuous fluctuation; 2. If the issue persists after disconnecting all connections and restarting, report for repair

Frequent tripping of circuit breakers: 1. The total power of the connected electrical appliances exceeds the standard; 2. Electrical short circuit; 3. Cable damage and short circuit: 1. Reduce the number of connected electrical appliances and calculate the total power; 2. Disconnect all electrical appliances and connect them one by one to check for short-circuit devices; 3. Check if the cable is damaged and replace the faulty cable


  • Metso XZB10025-011T12 - Moog Valve 9650962700
  • Metso XZB10025-010T12 - Moog Valve 9650965300
  • Metso-SP Transmitter Cable - Operating Unit with 10m Cable
  • Harkila Metso Hybrid - Hunting Jacket Willow Green
  • Metso ND8221/S1 - Neles Valve Positioner
  • Metso METSO10119 - ScreenCheck Component
  • Metso LK-2025 - Linkage Kit
  • Metso A416733 - IQweight External Air Gap Temperature Sensor
  • Metso RKC22MT - Automation Component
  • Metso A413281 - Automation Board
  • Metso LCP9HLY - Stainless Steel Enclosure
  • Metso NP704S/B1S1 - Pneumatic Positioner with I/P Converter
  • Metso BAH3 - Slurry Seal Type
  • Metso A413531-03 - PLC Module Chassis Rack
  • Metso P4610004 - MCAI Communicator Controller
  • Metso QN2AN03HDM - Quartz Valve Positioner Stonel
  • Metso RKW-352-XZ - Automation Component
  • Metso A4300081 - Kajaani LCD Display
  • Metso A428026 7B - Kajaani Rectifier Unit 1
  • Metso 202218 - Kajaani Sensor Power Supply SR 902660
  • Metso 9150 316SS CSTL - Jamesbury 150-2" BN50 Valve
  • Metso 81806 - IOP101 Module
  • Metso STOM000272 - Paper Bushing CR38
  • Metso 1975413 - Chain Hoist Links
  • Metso IMO G053-191597 - Minor Seal Kit
  • Metso VAL0087418 - Cylinder Valmet NTS6LV
  • Metso A413061 - DMU Board VPA 420355-4B
  • Metso P2620-80/25-100 - Automation Component
  • Metso VAL0035292 - Automation Component
  • Metso A413721 - Automation Component
  • Metso ST600 - Automation Component
  • Metso P4500001 - Automation Component
  • Metso SDBX/RA2 - CAT x KVM Extender
  • Metso D201126-DI8 - Digital Input Module
  • Metso D201189L - AI8H Analog Module
  • Metso NA004418 LK1016 - Wafersphere Actuator Mounting Bracket
  • Metso RKN172MTT - Repair Kit
  • Metso MM0311584 - Air Filter Kit RadialSeal
  • Metso 181517 - IOP301 Isolated Analog Input Module
  • Metso RAU3906506 - Automation Component
  • Metso 181208 - IOP332 Digital Input Module
  • Metso A413760 - AIF2C PCB Module
  • Metso 006 1089 36 - Shaft Bearing Seal
  • Metso A413046 - Automation Component
  • Metso VKJ650 - Automation Brake Component
  • Metso LK-1875 - Linkage Kit
  • Metso D201193L - FI4S24 Frequency Input Module
  • Metso D200533 - BIU82 Binary Input Module
  • Metso 500838-M1 - Impeller Pump Release Collar Assembly
  • Metso 2.00SB2ALUS19A - Pneumatic Cylinder 1.375 Stroke
  • Metso D201351 - RES Reserve Module
  • Metso A416100 - IQMoisture Spare Part Kit Halogen Lamp
  • Metso Slurry Pump - Back Liner
  • Metso 7088010042 - Bronze Lantern Ring
  • Metso IMC-101-M-SC - Industrial Media Converter
  • Voith S1-S1-CAM-ENCL - Metso Pump Cmare Housing & Bracket
  • Metso A4430726V1.1 - Kajaani Connection Box CI 4-9-10
  • Metso A413016 - NCU2 PLC Board
  • Metso D202213P - MBMT80 Base
  • Metso A413135 - AOU-4 Analog Output Board
  • Metso NP 724A - Pneumatic Valve Positioner
  • Metso A413246 - Automation Controller Module
  • Konaflex VKJ-650 - Disc Brake Set Pair
  • Metso WIN3096535D - Core Chuck
  • Metso D201380 - MBR Base with IBC & IPS
  • Metso D202213L - MBMT80 Base Module
  • Metso 181571 - IOP337 PLC Module
  • Metso MF0588336 - Main Hydraulic Filter
  • Metso 181504 - IOP303 RTD Input Module
  • Metso A413240 - PIC2 Board
  • Denver 566534PS - Case Liner Gland Side SRL Frame 2
  • Metso 181508 - IOP322 Digital Input Module 120V
  • Metso 181520 - IOP351 Relay Output Module Form A/B
  • Metso 181220 - IOP351 Relay Output Module
  • Metso A413150 - BOU 8 Binary Output Module
  • Metso 128400-M1 - Impeller
  • Metso D201379 - MBB Base with IBC & IPS
  • Metso 205181 - T/B MTD PRWSW Assembly
  • Metso QPX1C/K15 - Jamesbury Quadra-Powr X Actuator Valve
  • Harkila Metso Winter - Hunting Jacket Willow Green
  • Metso NE724A/A-L - Electro-Pneumatic Positioner
  • Metso PACP-100-80-31 916 - Automation Component
  • Metso 81814 - Automation Component
  • Metso ER-12-01-M-CT - Automation Board
  • Metso ELO24 - Automation Board
  • Metso A413000 - Valmet Neles CPU PLC Board
  • Metso XL-2213-0525 - Mainframe Bushing
  • Metso D100097 - ECR Extension Module
  • Metso 804511 - Filter Housing Assembly
  • Metso S420154 - Automation Rack Chassis
  • Metso M851232 - Automation Module
  • Metso D100532 02 - Automation Board
  • Neles QPX1C/M - Ball Valve with Quadra-Powr X Actuator
  • Metso 181535 - IOP322 Isolated Analog Output Module
  • Metso RKN-184-XTZ - Ball Valve Seat Repair Kit 4"
  • Metso N22022621 - Metal Plate
  • Metso 181560 - IOP341 Positioner Module
  • Metso LT 1213 S - Filter Service Kit for CAT C12 Engine
  • Aq-Matic 0032-99000 - Valve Diaphragm
  • Metso D200535 - BOU8 Output Board
  • Metso EDS-305-M-SC - Ethernet Switch
  • Metso 80424 - IOP110 Analog Output Module
  • Metso IOP351 - Relay Output Module Form A/B
  • Metso 181572 - IOP342 Module
  • Metso 1-1-2A3600TT - Ball Valve 1.5"
  • Metso A413154 - BOU8-4 Output Module
  • Metso A413140 - Valmet BIU 8 Board
  • Metso D201139 - IPS Power Supply type DDC7940
  • Metso PGH P411382-2000 - Metal Feed/Filtrate Hose
  • Valmet 503201404 - Automation Board
  • Metso 181507 - IOP331 Controller Module
  • Metso A413141 - BIU82 Binary Input Module
  • Metso KSD7447686 - Pneumatic Cylinder 5" Bore
  • Metso APL3003850 - Automation Component
  • Metso D201135L - Automation Controller
  • Metso A413125 - AIU8 Analog Input Module
  • Metso A413325 - IPU Power Unit
  • Metso 181573 - IOP346 PLC Module
  • Metso A413143 - BIU84 Binary Output Module Card
  • Metso A413152 - BOU82 Output Module
  • Metso PDP603 - Distributed Processing Unit 181555
  • Metso PDP601 - Distributed Processing Unit 181555
  • Metso A413040 - DCS Board DCU
  • Metso A413082 - CPU Processor Module
  • Valmet TI4W3 - Temperature Input Module
  • Valmet FI4S24 - Frequency Input Module
  • Metso 1064669615 - Fulcrum Bar
  • Valmet 181206 - IOP330 Digital Input Module