+086-15305925923

K-WANG

Service expert in industrial control field!
NameDescriptionContent
Adequate Inventory, Timely Service
pursuit of excellence 
Ship control system
Equipment control system
Power monitoring system
Current position:
新闻动态
newS
   
Brand

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

From: | Author:Wang | Time :2025-11-13 | 327 visit: | 🔊 Click to read aloud ❚❚ | Share:

Westinghouse ST Switch Intelligent Automatic Portable Transfer Switch

Core parameters and compatibility

1. Key specifications

Output parameters: 120V, 20A, 60Hz, maximum output power matching generator operating power of 2400W.

Input parameters: Grid input 120V 20A 60Hz, generator input 120V 20A 60Hz (equipped with L14-30P plug).

Interface configuration: 120V 20A 5-20R dual socket, grid power input port, generator control cable interface, 25 foot generator power cord.

Protection configuration: 20A circuit breaker to prevent overload damage to equipment.

2. Compatibility requirements

Only compatible with Westinghouse generators with "Smart Switch Ready" interface, not compatible with other brands or generators without this interface.

Do not use in series with other conversion switches, do not connect GFCI sockets or use socket adapters.


Core functions and working principles

1. Full process working mechanism

(1) When the power grid is normal (standby mode)

Power supply path: grid power supply → transfer switch → connected electrical appliances. At this time, the green "grid power indicator light" is constantly on.

Additional function: The generator battery is continuously charged by the power grid through the generator control cable, ensuring that the generator battery is fully charged and can be started at any time.

Key state: The generator is in the "RUN" position but not starting, only the battery charging circuit is working.

(2) When the power grid is cut off (emergency power supply state)

Trigger mechanism: When the conversion switch detects a power outage in the power grid, the red "power grid interruption indicator light" immediately lights up.

Start up process: After a delay of 5-10 seconds (to avoid accidental triggering due to instantaneous fluctuations in the power grid), send a start signal to the generator through the control cable, and the generator will automatically start and enter a stable operating state.

Switching power supply: After the generator output stabilizes (within about 30 seconds), the transfer switch automatically cuts off the power grid circuit and connects the generator power supply circuit. The green "generator power indicator light" lights up, and the electrical appliances are powered by the generator.

(3) When the power grid is restored (switching and cooling state)

Detection process: After the power grid is restored, the transfer switch first undergoes a 5-10 second stability test (to prevent frequent switching caused by voltage fluctuations in the power grid), and at this time, the red and green indicator lights are constantly on.

Switching power supply: After confirming the stability of the power grid, cut off the generator power supply circuit, connect the power grid circuit, the red "power grid interruption indicator light" will turn off, and the electrical appliances will resume power supply to the grid.

Cooling shutdown: The switch keeps the generator running for 45-50 seconds during the cooling period to avoid damage to the engine caused by high-temperature shutdown. After the cooling is complete, the generator will automatically shut down and the green "generator power indicator light" will turn off.

2. Full analysis of indicator lights (including abnormal states)

Description of indicator light combination status and operation suggestions

Only the green grid light stays on and is in normal standby mode. The power is supplied by the grid, and there is no need to operate the generator battery during charging. Regularly check the cable connections

Only the red power grid interruption light remains on. The power grid has been cut off, and we are waiting to start the generator to confirm that the fuel and oil are sufficient and there are no fault alarms

Only the green generator light is constantly on, and the power grid has not been restored to monitor the operation status of the generator to ensure sufficient fuel supply

The traffic lights are constantly on at the same time, and the power grid has been restored. Stability testing will be conducted and wait for 5-10 seconds without manual intervention

The green light stays on and the red light flashes. The power grid is restored but the voltage is unstable. Keep observing. If it does not return to normal within 1 minute, check the power grid line

The generator light is constantly on+the grid light is flashing. The generator power supply is normal, and the grid is in a fluctuating state without operation. The transfer switch will continue to monitor the grid

No indicator light is on, the conversion switch is not connected to the power grid, or there is an internal fault. Check if the power grid connection line is tightly plugged in. If the connection is normal, it needs to be reported for repair

Safety operation standards (including risk avoidance)

1. Installation and placement safety

Generator placement requirements:

It must be placed in an outdoor ventilated area, at least 15 feet (about 4.6 meters) away from the doors, windows, and ventilation openings of the house, to prevent carbon monoxide exhaust from entering the room.

Place on a hard, level surface to avoid tilting and causing fuel leakage; Keep a safe distance of at least 3 feet (approximately 0.9 meters) away from flammable materials such as hay, wood, and paint.

It is prohibited to place the generator on rainy, snowy, or damp ground. A temporary rain shelter (not enclosed) must be built to prevent rainwater from entering the generator and causing a short circuit.

Requirements for placement of transfer switch:

Only suitable for indoor use, placed in a dry, ventilated, away from water sources (such as kitchens, bathrooms) and flammable materials.

Do not place it in areas prone to water accumulation such as basements and low-lying areas to avoid equipment short circuits caused by floods or water leaks.

The placement height should be at least 1 foot (about 0.3 meters) above the ground to prevent moisture erosion on the ground.

2. Cable connection safety

Connection sequence: The power grid must be connected first, then the generator control cable, and finally the generator power line. It is forbidden to reverse the sequence.

Cable requirements:

Grid input extension cable: A grounded three core cable with no damage or aging is required, with a length not exceeding 30 feet (approximately 9.1 meters) and a core cross-sectional area of ≥ 1.5mm ².

Generator control/power cord: The total length should not exceed 50 feet (approximately 15.2 meters). If extension is required, Westinghouse original extension cords (model 3021225C is the power cord extension cord, STCORD25 is the control cable extension cord) must be used. Non original cables are prohibited.

Connection operation:

All connections must be made after the generator is turned off and cooled down, and the plug must be fully inserted into the interface and locked to avoid loosening and overheating.

After connection, check that the cables are not twisted or compressed, and keep them away from high-temperature components such as the generator exhaust pipe to prevent cable aging.

3. Safety of electrical loads

Load accounting rules:

Pure resistance load (light bulb, heater, rice cooker): total operating power ≤ 20A × 120V=2400W.

Inductive loads (motors: refrigerators, water pumps, air conditioners): starting power=operating power multiplied by multiple (small handheld devices multiplied by 1.2, large fixed devices multiplied by 3.5), total starting power ≤ 2400W.

Example: 1500W space heater (pure resistor)+700W refrigerator (starting power 700 × 3.5=2450W), total starting power 2450W>2400W, cannot be connected simultaneously; 1500W heater+500W furnace (starting power 500 × 1.2=600W), total starting power 2100W ≤ 2400W, can be connected simultaneously.

Taboo for load connection:

Prohibit the connection of electrical appliances with unknown power to avoid overload triggering circuit breaker tripping.

It is prohibited to simultaneously connect multiple large inductive loads (such as two air conditioners, one water pump+one air conditioner) to prevent excessive starting power.

When connecting electrical appliances, it is necessary to first turn off the electrical switch and then turn it on again to avoid arcing caused by load insertion and removal.

4. Emergency safety handling

Generator malfunction unable to start: Immediately disconnect the transfer switch from the generator, manually start the generator to troubleshoot (such as low fuel, low oil, spark plug malfunction), and reconnect after troubleshooting.

The transfer switch does not switch the power supply: check the status of the indicator light. If the red light is on after the power grid is cut off but the generator does not start, check the connection of the control cable; If the green light does not turn on after the generator is started, check the power cord connection and restart the transfer switch if necessary (unplug the power grid for 30 seconds and then reinsert it).

Fire/Leakage Emergency: Immediately shut down the generator, unplug all connecting wires of the transfer switch, and use ABE or BE class fire extinguishers to extinguish the fire (water is prohibited from extinguishing electrical fires); If electric shock occurs, immediately cut off the power and seek medical attention.


Operation process (setup+testing+daily use)

1. Initial process setup (required steps)

Generator preparation:

Place the generator in a safe outdoor location, check that the fuel (unleaded gasoline) and engine oil (four stroke engine oil that meets the requirements of the generator) levels are normal, and that the battery connection is secure.

Start the generator and test it to run normally independently. After confirming that there are no fault alarms, turn it off and cool it down to room temperature.

Switch connection:

Place the transfer switch in a dry indoor location, connect the grid power supply to the "grid power input port" of the transfer switch with a grounding extension wire, and the green grid indicator light will light up at this time.

Connect the generator control cable: Insert one end into the "Smart Switch Ready" interface of the generator and the other end into the "Control Cable Interface" of the conversion switch. You can hear the locking sound of the buckle.

Connect the generator power cord: Insert the 25 foot power cord L14-30P plug that comes with the conversion switch into the generator L14-30R socket, and tighten the fixing nut.

Electrical connections and generator settings:

Connect the electrical appliances that require emergency power supply (such as refrigerators and heaters) to the 120V dual socket of the conversion switch to ensure that the total power does not exceed the standard.

Turn on the "RUN" switch of the generator, confirm that the generator battery indicator light is on (indicating that the charging circuit is normal), and complete the first setting.

2. Functional testing process (must be done before first use)

Test purpose: To verify that the automatic switching function of the transfer switch is normal and to avoid failure in emergency situations.

Test preparation: Ensure all connections are complete, connect a small appliance (such as a desk lamp, phone charger), and confirm that the appliance is powered by the power grid normally.

Simulated power-off test:

Unplug the power grid input extension line of the conversion switch and simulate a power outage in the power grid.

Observe the indicator light: The red power grid interruption light will immediately turn on, and the generator will automatically start after 5-10 seconds.

Confirm switch: About 30 seconds after the generator starts, the green generator light will turn on, and the electrical appliances will be powered by the generator normally.

Simulated recovery test:

Re insert the power grid input extension line to simulate power grid recovery.

Observe the indicator lights: both traffic and green lights remain on (5-10 second detection period), then the red light goes out and the electrical appliances resume power supply to the grid.

Confirm shutdown: Wait for 45-50 seconds, the generator will automatically shut down, the green generator light will turn off, and the test is complete.

Exception handling: If a step in the test is not executed as expected, check if the cable connection is secure and if the generator is in the "RUN" position. After troubleshooting, retest.

3. Daily use and emergency activation process

(1) Daily maintenance (non emergency state)

Every month: Check if all cable connections are secure, without damage or aging; Start the generator and run it for 10 minutes to ensure that there are no faults in the generator.

Every 6 months: Conduct a complete test of the transfer switch according to the "functional testing process" to ensure that the automatic switching function is normal; Check the battery level of the generator and recharge it if necessary.

Long term use (exceeding 3 months): Disconnect the transfer switch from the power grid and generator, store the transfer switch in a dry environment, and maintain the generator according to long-term storage requirements.

(2) Emergency use (sudden power outage in the power grid)

No manual operation required: The switch automatically completes the entire process of "detecting power failure → starting the generator → switching power supply".

Key monitoring: Observe the status of the conversion switch indicator light and confirm that it switches as expected; Monitor the fuel level of the generator and replenish fuel if necessary under safe conditions (operate after shutting down the generator and cooling it down).

After the power grid is restored: without intervention, the transfer switch automatically switches back to the grid and shuts down the generator. After the generator cools down, its "RUN" switch can be turned off (or kept on for the next emergency start).


Maintenance and Warranty

1. Key points of maintenance and upkeep

Switch maintenance:

Cleaning: Use a dry cloth to wipe away surface dust. Do not use water or solvents for cleaning to prevent liquids from entering the interface.

Storage: When not in use for a long time, disconnect all connections and place in a dry, ventilated storage box, avoiding direct sunlight and high temperature and humidity environments.

Testing: Conduct a functional test every 6 months to ensure that there are no faults in the internal circuit.

Cable maintenance:

Regularly inspect the cable sheath for any damage or cracking, and ensure that the plug has no signs of oxidation or erosion.

Avoid excessive bending and squeezing during storage to prevent internal core breakage; The generator end cable should be kept away from high-temperature components such as exhaust pipes.

2. Detailed explanation of warranty policy

Warranty period: 1 year from the date of purchase, covering faults caused by material and process defects.

Warranty scope: For quality issues with the main body of the conversion switch and original cables (control cables, power cords), free repair or replacement of faulty components is provided.

Not covered by warranty:

Human damage (such as falling, collision, liquid immersion, overload use).

Unauthorized maintenance and modification (such as splicing cables, replacing non original components).

Normal wear and tear (such as plug contact wear), damage caused by natural disasters or accidents.

Malfunctions caused by failure to follow the manual, such as connecting incompatible generators or illegally extending cables.


Common troubleshooting

Possible causes and solutions for fault phenomena

The generator does not start after the power grid is cut off. 1. The control cable is not properly connected; 2. Insufficient battery power in the generator; 3. The generator is in the "OFF" position; 4. Generator malfunction (insufficient fuel/oil, alarm lock) 1. Check if the control cable plug is securely plugged in; 2. Manually start the generator to charge the battery or replace the battery; 3. Confirm that the generator is in the "RUN" position; 4. Check for generator faults and solve them according to the generator manual

The power supply is not switched after the generator is started. 1. The power cord is not properly connected; 2. Generator output fault; 3. Overload protection trip of transfer switch 1. Check if the power cord plug is tightened; 2. Disconnect the conversion switch and directly use the generator to supply power to the electrical appliance, verifying the output of the generator; 3. Disconnect part of the load and press the reset button of the circuit breaker on the transfer switch

After the power grid is restored, it will not switch back to the grid. 1. The voltage of the power grid is unstable; 2. Switch detection circuit fault 1. Use a multimeter to measure the grid voltage (normal 110-130V) and eliminate the grid problem; 2. Restart the conversion switch (unplug for 30 seconds and then reinsert), if it still does not work, report for repair

Abnormal flashing of indicator light: 1. Grid voltage fluctuation; 2. Internal circuit failure of the transfer switch. 1. Observe the restoration of the power grid and contact the power company if there is continuous fluctuation; 2. If the issue persists after disconnecting all connections and restarting, report for repair

Frequent tripping of circuit breakers: 1. The total power of the connected electrical appliances exceeds the standard; 2. Electrical short circuit; 3. Cable damage and short circuit: 1. Reduce the number of connected electrical appliances and calculate the total power; 2. Disconnect all electrical appliances and connect them one by one to check for short-circuit devices; 3. Check if the cable is damaged and replace the faulty cable


  • ABB PFSA240 Roll DC Supply Unit 3BSE073476R1 Industrial Stressometer Power Supply Module for Rolling Mill Systems
  • ABB PFSA107-Z42 DTU Stressometer Digital Transmission Unit High Precision Strip Tension Measurement Module
  • GE AT868-2-1-1 Ultrasonic Flow Transmitter AquaTrans AT868 Dual Channel Industrial Flow Meter
  • ABB SCC-C 23070-0-10232110 Industrial Control Module Automation System Communication Controller
  • APPLIED MATERIALS 0041-96185 - Heater Assy with 0150-45776 0190-60492 AMAT
  • APPLIED MATERIALS 0021-33426 - SHIELD INNER SINGLE 300MM NO COIL AMAT
  • APPLIED MATERIALS 0140-01905 - HARNESS ASSY DUAL IHC PRESS CONT ADAPTER 16798 AMAT
  • APPLIED MATERIALS 0051-01848 - LINE VAC EXHAUST CH Y LEAK CHECK PORT EPI AMAT
  • APPLIED MATERIALS 0010-02863 - P5000 150mm Teos Susceptor AMAT
  • APPLIED MATERIALS 0010-14056 - ASSY INJECT NOZZLE STANDARD AMAT
  • APPLIED MATERIALS 0020-34694 - LINER GDP R2 OXIDEGECO AMAT
  • APPLIED MATERIALS 0195-07416 - SYCAMORE-X CMP POLISHER I/O ASSEMBLY AMAT
  • APPLIED MATERIALS 0200-09036 - WAFER LIFT PIN AMAT
  • APPLIED MATERIALS 0021-39090 - FLANGE 10" CONFLAT ADAPTOR AMAT
  • APPLIED MATERIALS 0100-99011 - GAS INTERLOCK AMAT
  • APPLIED MATERIALS 0100-11002 - digital I/O card AMAT
  • APPLIED MATERIALS 0190-40000 - PNEUMATIC MANIFOLD CHAMBER 32903 AMAT
  • APPLIED MATERIALS 0021-39792 - PERF PLATE OX. 200 MM TEOS 21896 AMAT
  • APPLIED MATERIALS 0040-04896 - BELL JAR QUARTZ Q-KOTE 200MM AMAT
  • APPLIED MATERIALS 0020-20653 - BASE HEATER AMAT
  • APPLIED MATERIALS 0190-75057 - Lift Cylinder Assy AMAT
  • APPLIED MATERIALS 0010-70345 - Applied Materials 0042-01927
  • APPLIED MATERIALS 0100-91024 - PWBA PRE-ACCEL VENDOR I/F PCB 9500 IMPLANT AMAT
  • APPLIED MATERIALS 0041-56144 - HEATER PEDESTAL ASSEMBLY ENP FCVD EDGE AMAT
  • APPLIED MATERIALS 0090-00836 - SOURCE MOTOR ASSY 0040-24074 GFB5G10 FBLM5120W AMAT
  • MKS 0190-63631 - MASS FLOW VERIFIER MFVA-33168 AMAT
  • APPLIED MATERIALS 0100-35070 - ASSY PCB RF GENERATOR INTERFACE AMAT
  • APPLIED MATERIALS 0010-32221 - ASSEMBLY ROUGH THROTTLE VALVE DRIVE 300MM AMAT
  • SANYO DENKI 0190-14713 - P30B06040HXS8RM AC SERVO MOTOR BL SUPER AMAT
  • APPLIED MATERIALS 0190-14224 - FLEX DIST PANEL AMAT
  • APPLIED MATERIALS 0190-23897 - SPECIFICATION EXMP SYNCNET STAND ALON 14535 AMAT
  • APPLIED MATERIALS 0010-04542 - HEATER ASSY 200MM FC WXZPLUS OSCR 15607 AMAT
  • APPLIED MATERIALS 0190-51414 - AC SERVO DRIVER SGDV-OCA05AY890AA AMAT
  • APPLIED MATERIALS 0020-31747 - P5000 LOADLOCK LID WAFER TXR CHMBR 0020-32930 12573 AMAT
  • APPLIED MATERIALS 0620-01727 - CABLE ASSY SIGNAL RBN 50PIN DSUB EMI RES 17781 AMAT
  • APPLIED MATERIALS 0190-A9510 - IP POWER SUPPLY 33361 AMAT
  • APPLIED MATERIALS T1101-05-000-30 - CRYO TIGER COMPRESSOR AMAT
  • APPLIED MATERIALS 0040-13338 - LINK 1 UPPER 7.2 DEGREE OFFSET CR 300MM 38177 AMAT
  • APPLIED MATERIALS 0190-06926 - Cable SQS R/A TO SQS R/A #2 AMAT
  • APPLIED MATERIALS 0200-00705 - EDGE RING THIN 200MM AMAT
  • APPLIED MATERIALS 0190-01399 - INLINE O3 SNSR ULTRA FULL FLOW HI-CON 6627 AMAT
  • APPLIED MATERIALS 0190-21054 - RF MATCH CABLE ASSEMBLY PRECLEAN 2 AMAT
  • APPLIED MATERIALS 0041-12156 - REFLECTOR PLATE INJECT 300MM RADIANCE PLUS 29763 AMAT
  • MKS 0100-03680 - PCB CHMBR DIST 0090-09483 AS00363-16 35465 AMAT
  • APPLIED MATERIALS E11355460 - Plasma Detector E11355470 Rev.B AMAT
  • APPLIED MATERIALS 0021-33981 - LOWER SHIELD AMAT
  • APPLIED MATERIALS 0100-00583 - GAS PANEL CONTROLLER DIST AMAT
  • APPLIED MATERIALS 0010-54820 - IPC VALVE ASSEMBLY FM 1/2" INTER-PLATEN SPRAY AMAT
  • APPLIED MATERIALS 0020-31747 - P5000 LOADLOCK LID WAFER TXR CHMBR 0020-32930 12573 AMAT
  • APPLIED MATERIALS 0020-40566 - BLANK-OFF POSITION E-F ENP AMAT
  • APPLIED MATERIALS 0021-31023 - Flange Spacer Automatch Single RPS Producer SE AMAT
  • APPLIED MATERIALS 0020-21225 - WEIGHT RING 300MM TITAN PROFILER AMAT
  • APPLIED MATERIALS 0190-A9510 - IP POWER SUPPLY 33361 AMAT
  • APPLIED MATERIALS 0100-90618 - PCB H1 GROUND PDU MOTHER BOARD 0100-90036 AMAT
  • APPLIED MATERIALS 0010-04542 - HEATER ASSY 200MM FC WXZPLUS OSCR 15607 AMAT
  • APPLIED MATERIALS 0020-31658 - CLAMP VESPEL OX-MLR-NIT 200MM AMAT
  • APPLIED MATERIALS 0021-09974 - WINDOW SAPPHIRE PUMPING PLATE AMAT
  • APPLIED MATERIALS 0051-01849 - LINE VAC EXHAUST ELBOW CH Y FAC TRAY EPI 30 AMAT
  • APPLIED MATERIALS 0010-29842 - 300mm DBR High Temp Belt Wrist Titanium AMAT
  • APPLIED MATERIALS 1410-01166 - Heating Jacket AMAT
  • APPLIED MATERIALS 0620-01727 - CABLE ASSY SIGNAL RBN 50PIN DSUB EMI RES 17781 AMAT
  • APPLIED MATERIALS 0010-70345 - Applied Materials 0042-01927
  • APPLIED MATERIALS 0090-00836 - SOURCE MOTOR ASSY 0040-24074 GFB5G10 FBLM5120W AMAT
  • APPLIED MATERIALS 0190-46837 - INFRARED THERMOMETER COMM BOX RAYMI3COMM 30009 AMAT
  • APPLIED MATERIALS 0020-31886 - FLANGE INSULATION UNIBODY .400 THK AMAT
  • APPLIED MATERIALS 0010-05920 - CONTROLLER CCM PROD ETCH CS-PM CARD CAGE AMAT
  • APPLIED MATERIALS 0242-30292 - KIT 20 SCCM MFC W/HRDWR UNIBODY 6449 AMAT
  • APPLIED MATERIALS 0040-41061 - JIG FOUR PT LEVELING TOOL TXZ 300MM AMAT
  • APPLIED MATERIALS 0020-30287 - ADAPTER RING PUMPING PLATE 200MM COMMO AMAT
  • APPLIED MATERIALS 0041-12156 - REFLECTOR PLATE INJECT 300MM RADIANCE PLUS 29763 AMAT
  • APPLIED MATERIALS 0010-37866W - ASSY INT ISRM MODULE FULL SCAN SMG AMAT
  • APPLIED MATERIALS 0090-08137 - 300MM TXZ DLI HEATER CONTROLLER MODULE AMAT
  • APPLIED MATERIALS 0040-20006 - ARM WELDMENT SOURCE STD 8464 AMAT
  • APPLIED MATERIALS 0090-07392 - Dual RF filter AMAT
  • APPLIED MATERIALS 0190-06926 - Cable SQS R/A TO SQS R/A #2 AMAT
  • APPLIED MATERIALS 0020-70279 - LIFTER 150MM WAFER ORIENTER P5000 AMAT
  • APPLIED MATERIALS 0190-35652 - SERIPLEX MUX I/O PCB AMAT
  • APPLIED MATERIALS 0100-11002 - digital I/O card AMAT
  • APPLIED MATERIALS E11355460 - Plasma Detector E11355470 Rev.B AMAT
  • APPLIED MATERIALS 0010-19188 - ASSY COOLDOWN LIFT 34703 AMAT
  • APPLIED MATERIALS 0100-00975 - PCB STEPPER CONTROLLER 2 8099 AMAT
  • APPLIED MATERIALS 0190-16236 - MOTOR ENCODER ASSY ROBOT WRIST MIRRA CMP AMAT
  • APPLIED MATERIALS 0040-48671 - LEFT GUIDE 300MM L-DOOR 37961 AMAT
  • MKS 0100-03680 - PCB CHMBR DIST 0090-09483 AS00363-16 35465 AMAT
  • APPLIED MATERIALS 0190-01399 - INLINE O3 SNSR ULTRA FULL FLOW HI-CON 6627 AMAT
  • APPLIED MATERIALS 8330 - Pair Of Side viewport Panels AMAT
  • APPLIED MATERIALS 0190-75057 - Lift Cylinder Assy AMAT
  • APPLIED MATERIALS 0100-02016 - PCB ASSY ANALOG SYNC DETECT 904-125N AMAT
  • Abaco Systems 0090-08517 - VMICPCI-7326 PCB 38085 AMAT
  • APPLIED MATERIALS 0100-20069 - ASSY WAFER ORIENTER BOARD 0100-02797 AMAT
  • ELEKTRO-AUTOMATIK EA-PS 9036-070 - S01 POWER SUPPLY 625-795365 AMAT
  • APPLIED MATERIALS 3310-00139 - CAPACITANCE PIRANI GAUGE C-SEAL MOUNT 15-PIN AMAT
  • APPLIED MATERIALS 0010-00510 - ASSY BEARING STD 36806 AMAT
  • APPLIED MATERIALS 0041-13895 - FACEPLATE 26MIL CENTERHOLE RF CAP 300MM SACVD 13964 AMAT
  • APPLIED MATERIALS T1101-05-000-30 - CRYO TIGER COMPRESSOR AMAT
  • APPLIED MATERIALS 0050-10076 - WELDMENT DUAL HE MANF SACVD 20243 AMAT
  • MKS 0190-48179 - AS01294-05237-030 Hardened DeviceNet I/O Block AMAT
  • APPLIED MATERIALS 0240-75102 - 8" Transfer Blade 200mm End Effector AMAT
  • APPLIED MATERIALS 0110-90770 - Index Control PCB AMAT
  • APPLIED MATERIALS 0090-91209 - SOURCE SUPPRESSION CLAMPING BOX AMAT
  • APPLIED MATERIALS 0200-01427 - ISOLATOR CERAMIC CVD LOW K 300MM PROD AMAT
  • APPLIED MATERIALS 0021-03637 - FACEPLATE SILANE PRODUCER 200MM AMAT
  • APPLIED MATERIALS 0010-09837 - Wafer Lift Tungsten Precision 5000 AMAT
  • APPLIED MATERIALS 0101-57014 - PCB DEFLECTION-AMPLIFIER BOARD D-AMP 50-06 26296 AMAT
  • APPLIED MATERIALS 0190-36715 - PCB GP IO DISTRIBUTION AMAT
  • APPLIED MATERIALS 0660-00078 - PCB ASSY DNET ANALOG I/O CDN396 DIP-506-068 13392 AMAT
  • APPLIED MATERIALS 0190-B4670 - FIBER HARNESS DVD2-SBBI AMAT
  • APPLIED MATERIALS 1080-02356 - ACCELNET SINGLE AXIS SERVO DRIVE 800-2122 AMAT
  • APPLIED MATERIALS 0040-02937 - WATER MANIFOLD TXZ CIP 200 & 300MM AMAT
  • APPLIED MATERIALS 0040-08944 - LID ANNEAL ECP 200MM AMAT
  • SMC INOI-7134-111 - 4-PORT DEVICENET UPA MODULE Pressure Control AMAT
  • SMC INOI-7134-21 - 4-PORT DEVICENET UPA MODULE Pressure Control AMAT
  • APPLIED MATERIALS 0100-40024 - ASSY WPCBA LOADLOCK INTERCONNECT BOARD AMAT
  • APPLIED MATERIALS 0660-01635 - Chamber P2 Board A AMAT
  • APPLIED MATERIALS 0041-31945 - DOOR ENP ALUM SPD SLIT VALVE VITON LLK 3 AMAT
  • APPLIED MATERIALS 0040-48671 - LEFT GUIDE 300MM L-DOOR 37961 AMAT
  • APPLIED MATERIALS 0051-01849 - LINE VAC EXHAUST ELBOW CH Y FAC TRAY EPI 30 AMAT
  • APPLIED MATERIALS 0040-81661 - CATHODE FACILITY PLATE 35320 AMAT
  • APPLIED MATERIALS 0040-20006 - ARM WELDMENT SOURCE STD 8464 AMAT
  • APPLIED MATERIALS 0110-90770 - Index Control PCB AMAT
  • APPLIED MATERIALS 8330 - Pair Of Side viewport Panels AMAT
  • APPLIED MATERIALS 0040-81155 - LINER LOWER AMAT
  • APPLIED MATERIALS 0100-90618 - PCB H1 GROUND PDU MOTHER BOARD 0100-90036 AMAT
  • APPLIED MATERIALS 0040-47677 - FACEPLATE SIN XG DXZ DCVD AMAT
  • APPLIED MATERIALS 0020-31658 - CLAMP VESPEL OX-MLR-NIT 200MM AMAT
  • CTI-CRYOGENICS 0190-54040 - ON-BOARD IS CONTROLLER 34633 AMAT
  • APPLIED MATERIALS 0020-21665 - SHIELD AL/TI 8 INCH WAFER AMAT
  • APPLIED MATERIALS 0090-10397 - RF FILTER BOX AMAT